Difference between revisions of "Coil Test Weekly Meeting 21-Oct-2010"
From GlueXWiki
m |
(→Solenoid Coil Test Weekly Meeting) |
||
(5 intermediate revisions by one other user not shown) | |||
Line 9: | Line 9: | ||
'''Agenda''' | '''Agenda''' | ||
− | * Responsibilities during test - Jonathan | + | * Review next week - George, Bill, Glenn, Elliott |
+ | ** what to do about "Quench Protection" talk? | ||
+ | * Quench detector - Elliott | ||
+ | ** how does it work during ramp up and down, given coil inductance of 6 H and 1 A/sec ramp rate? | ||
+ | ** do we need to reconfigure it? balance between sub-coils? | ||
+ | * Responsibilities during test - Jonathan, George, Elliott | ||
+ | ** 1500 A operation | ||
+ | ** turn-to-turn shorts | ||
+ | ** radial Heim column centering | ||
+ | ** LN2 and He heat leaks | ||
+ | ** LN2 and He thermal siphon | ||
+ | ** how do we determine when it is time to start warming up? | ||
* OSP status - Elliott | * OSP status - Elliott | ||
* Hall probe - Mark S | * Hall probe - Mark S | ||
Line 30: | Line 41: | ||
** communication with PLC | ** communication with PLC | ||
** connection to guard shack and notification conditions | ** connection to guard shack and notification conditions | ||
− | ** pager status and strategy | + | ** [[pager_status_10_21_2010 | pager status ]] and strategy |
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | * HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | ||
** current status | ** current status |
Latest revision as of 09:00, 21 October 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 21-Oct-2010 9:30 am ARC 428
Agenda
- Review next week - George, Bill, Glenn, Elliott
- what to do about "Quench Protection" talk?
- Quench detector - Elliott
- how does it work during ramp up and down, given coil inductance of 6 H and 1 A/sec ramp rate?
- do we need to reconfigure it? balance between sub-coils?
- Responsibilities during test - Jonathan, George, Elliott
- 1500 A operation
- turn-to-turn shorts
- radial Heim column centering
- LN2 and He heat leaks
- LN2 and He thermal siphon
- how do we determine when it is time to start warming up?
- OSP status - Elliott
- Hall probe - Mark S
- Installation and commissioning status - all
- pressure testing and certifications
- pumping/purging
- connection to cryo system
- ODH on platform?
- what else?
- Magnet power supply and interlock commissioning - Mark S
- shunt and ground fault detection
- Controls racks - Scot
- strain gauge and UPS interlocks
- commissioning
- anything else?
- PLC programming/testing status - Mark W
- UPS interlock
- what's left?
- EPICS - Hovanes
- communication with PLC
- connection to guard shack and notification conditions
- pager status and strategy
- HMI and EWEB programming - Yi, Hovanes
- current status
- Coil repair status - George
- Solenoid reviews 25-26 Oct and 7-Dec
- Purchase of another PLC and Ethernet module - Elliott
- Hall D Technical web page
- Preparations for testing next coil - George, Scot, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring
- connectors on next coil
- what else?