Difference between revisions of "BLTWG Meeting 02/28/2011"
From GlueXWiki
(→Agenda) |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | Time: | + | Time: 14:00 EST |
* Place: ESNET and EVO (with telephone bridge id 296 3277) | * Place: ESNET and EVO (with telephone bridge id 296 3277) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
Line 7: | Line 7: | ||
# Design of the vacuum chamber | # Design of the vacuum chamber | ||
+ | #* [http://www.jlab.org/~somov/tag_bg_neut.pdf Downstream end of the vaccum chamber] | ||
+ | #* [http://www.jlab.org/~somov/count_pos.txt Distance between the focal plane and VC exit window] | ||
# Fixed-array and microscope counter support structure | # Fixed-array and microscope counter support structure | ||
− | ## | + | #* Position of the microscope counters |
+ | #* Microscope counter optical fiber length | ||
+ | #* Hodoscopes calibration options; space needed |
Latest revision as of 14:54, 28 February 2011
Time: 14:00 EST
- Place: ESNET and EVO (with telephone bridge id 296 3277)
- Connecting: instructions are here
- Present:
Agenda
- Design of the vacuum chamber
- Fixed-array and microscope counter support structure
- Position of the microscope counters
- Microscope counter optical fiber length
- Hodoscopes calibration options; space needed