Difference between revisions of "BLTWG Meeting 03/07/2011"
From GlueXWiki
(→Agenda) |
|||
(8 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Time: 11:00 EST | Time: 11:00 EST | ||
− | * Place: ESNET and EVO (with telephone bridge id | + | * Place: ESNET and EVO (with telephone bridge id 302 9664) |
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Hannah W., Sascha S., Tim W., Hovannes E., Igor S., Jim M., Brendan P., Richard J. |
===Agenda=== | ===Agenda=== | ||
− | # [http://zeus.phys.uconn.edu/halld/ | + | # New geometry for beamline in Geant simulation -- ''Richard'' |
+ | # [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/tests-10-2010/parasitic-2-2011.pdf Parasitic beam time request goals] -- ''Richard'' | ||
+ | # [http://zeus.phys.uconn.edu/halld/tagger/fp-prototype/tests-10-2010/tests-2-2011.pdf mounting the active collimator in the alcove] -- ''Richard'' | ||
# Preparations for beam tests -- ''discussion'' | # Preparations for beam tests -- ''discussion'' | ||
# [[Pair Spectrometer Magnet Simulation]] Sascha Glamazdin/ Sascha Somov | # [[Pair Spectrometer Magnet Simulation]] Sascha Glamazdin/ Sascha Somov | ||
# [[Finalizing design of the vacuum chamber]] Sascha | # [[Finalizing design of the vacuum chamber]] Sascha |
Latest revision as of 12:34, 7 March 2011
Time: 11:00 EST
- Place: ESNET and EVO (with telephone bridge id 302 9664)
- Connecting: instructions are here
- Present: Hannah W., Sascha S., Tim W., Hovannes E., Igor S., Jim M., Brendan P., Richard J.
Agenda
- New geometry for beamline in Geant simulation -- Richard
- Parasitic beam time request goals -- Richard
- mounting the active collimator in the alcove -- Richard
- Preparations for beam tests -- discussion
- Pair Spectrometer Magnet Simulation Sascha Glamazdin/ Sascha Somov
- Finalizing design of the vacuum chamber Sascha