Line 13: | Line 13: | ||
=Items for followup from previous meeting= | =Items for followup from previous meeting= | ||
− | # Zisis will send the Regina light guide requirements to Will. | + | # <strike> Zisis will send the Regina light guide requirements to Will. </strike> |
= Documents to Review= | = Documents to Review= | ||
Line 21: | Line 21: | ||
# Announcements | # Announcements | ||
# Review of Action Items | # Review of Action Items | ||
− | |||
# USM update | # USM update | ||
− | |||
− | |||
# Simulations | # Simulations | ||
− | # | + | # [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1715 Electrical/cooling] (Elton) |
# Geometry and light guides | # Geometry and light guides | ||
+ | # SiPM update | ||
+ | ## First Article testing [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110322.pptx Update] | ||
= Minutes = | = Minutes = | ||
− | ''Attending: | + | ''Attending: Christina, George, Pavlos, Kappos (Athens); Elton, Beni, Tim, Eugene, Yi, John, Beni; Zisis, Andrei (UofR); Will, Serguei (USM) |
# Announcements | # Announcements | ||
− | #* | + | #* Will have a meeting on monitoring on Thu at 11:00, same venue |
# Review of Action Items | # Review of Action Items | ||
− | # | + | # Monitoring (Christina) |
− | #* | + | ## Discussions in Athens have clarified some questions regarding the proposed monitoring system |
+ | ##* The daisy chain scheme will not work unless the transistor (low impedance) is replaced by a mosfet (can be made into high impedance) without loss of performance | ||
+ | ##* Discussion about implementing the star arrangement. This could include placing the control board inside the Bcal readout housing. This board would be supplied with a few cables for communication, power and trigger. 20-40 cables to the LED boards would be distributed within the housing box | ||
+ | ## Questions to be answered include: | ||
+ | ##* Space inside the housing box for the control board | ||
+ | ##* Space between the light guides to place the LED boards | ||
+ | ## Note: Baby cal has now been released from customs (it only took about 3 months) | ||
# USM update | # USM update | ||
− | ## | + | ## Waiting for main prototype boards (expect toward the end of the month) |
− | ## | + | ## Alam is designing a NIM module for (slow) control of the multiplexors that distribute the signals inside the test box |
− | + | ## Implementation of the slow control software underway | |
− | ## | + | ## New board for testing a single SiPM should be received soon |
− | ## | + | ## SiPM from JLab is in customs and awaiting paperwork to be released |
− | + | ## Estimates for light guide production (unpolished): Athens (Apr 1); UofR (Apr 7); Jlab (May 1); | |
− | ## | + | # Simulations |
− | ## | + | # [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1715 Electrical/cooling] (Elton) |
− | # | + | #* Presented a summary of work at JLab |
− | # | + | #* Will: Cautioned about gas tightness (and light tightness) of connectors |
− | # | + | #* Eugene: Raised the concern about the connections for cooling fluid affecting particles at the end of the Bcal. We need to see if tubes can be bent radially outward |
− | + | #* Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box) | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
# Geometry and light guides | # Geometry and light guides | ||
− | #* | + | # SiPM First Article testing [http://www.jlab.org/~yqiang/halld/SiPM/first_article/Update_20110322.pptx Update] |
+ | #* 20 of 40 units have been tested. Preliminary results show performance exceeds specifications and uniformity is very good. |
Latest revision as of 17:12, 24 February 2017
Teleconference Time: 11:00 a.m. EST
- ESNET 8542553 and EVO session
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Phone:
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Items for followup from previous meeting
-
Zisis will send the Regina light guide requirements to Will.
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- USM update
- Simulations
- Electrical/cooling (Elton)
- Geometry and light guides
- SiPM update
- First Article testing Update
Minutes
Attending: Christina, George, Pavlos, Kappos (Athens); Elton, Beni, Tim, Eugene, Yi, John, Beni; Zisis, Andrei (UofR); Will, Serguei (USM)
- Announcements
- Will have a meeting on monitoring on Thu at 11:00, same venue
- Review of Action Items
- Monitoring (Christina)
- Discussions in Athens have clarified some questions regarding the proposed monitoring system
- The daisy chain scheme will not work unless the transistor (low impedance) is replaced by a mosfet (can be made into high impedance) without loss of performance
- Discussion about implementing the star arrangement. This could include placing the control board inside the Bcal readout housing. This board would be supplied with a few cables for communication, power and trigger. 20-40 cables to the LED boards would be distributed within the housing box
- Questions to be answered include:
- Space inside the housing box for the control board
- Space between the light guides to place the LED boards
- Note: Baby cal has now been released from customs (it only took about 3 months)
- Discussions in Athens have clarified some questions regarding the proposed monitoring system
- USM update
- Waiting for main prototype boards (expect toward the end of the month)
- Alam is designing a NIM module for (slow) control of the multiplexors that distribute the signals inside the test box
- Implementation of the slow control software underway
- New board for testing a single SiPM should be received soon
- SiPM from JLab is in customs and awaiting paperwork to be released
- Estimates for light guide production (unpolished): Athens (Apr 1); UofR (Apr 7); Jlab (May 1);
- Simulations
- Electrical/cooling (Elton)
- Presented a summary of work at JLab
- Will: Cautioned about gas tightness (and light tightness) of connectors
- Eugene: Raised the concern about the connections for cooling fluid affecting particles at the end of the Bcal. We need to see if tubes can be bent radially outward
- Need to get a firm number for the power dissipation in the monitoring control board (in case it is placed inside the housing box)
- Geometry and light guides
- SiPM First Article testing Update
- 20 of 40 units have been tested. Preliminary results show performance exceeds specifications and uniformity is very good.