− | **In attendance C. Heck, D. Butler, A. Johnson, T. Carstens, Tim Whitlatch, S. Speigel, | + | **In attendance C. Heck, D. Butler, A. Johnson, T. Carstens, Tim Whitlatch, S. Speigel, S. Ellis G. Humble, M. Beizer, B. Bunton, T. Mann, M. Stevens, |
* coil 3 in place - need to hi-pot | * coil 3 in place - need to hi-pot |
Latest revision as of 09:04, 25 March 2011
Meeting Time and Place
Friday March 25, 2011 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 231
Agenda
- ESH&Q minute - Clean and recycle
- Announcements - Budget
- training - ensure up to date
- Manpower
- Solenoid Test Status *
- FDC construction update
- Upcoming work
-
FDC practice foils, motion stage, Readiness review, lights - BCAL Wedges
- Solenoid 3
- Solenoid 2
- Permanent magnets
- Collimator cave - install stands
- Platform - install this summer
-
Open Action Items
- Permanent Magnet chambers reworked/leak check chambers
- Remove vacuum chamber and build/install new
- Need to make sure access to BCAL wedges in ESB (Tom)
- Block up existing BCAL boxes
- Move coils 1 and 4 to Hall D
-
Test flow switch in Mag field - Scot - Tom to work with Jim F. for BCAL readout prototyoe
- Order remaining controls items for the remaining coils - Scot
New Action Items
- Hi-pot coil 2 and leak check and insulation
Discussions
- In attendance C. Heck, D. Butler, A. Johnson, T. Carstens, Tim Whitlatch, S. Speigel, S. Ellis G. Humble, M. Beizer, B. Bunton, T. Mann, M. Stevens,
- coil 3 in place - need to hi-pot
- FDC readiness review Thursday
- good saMPLES FOR UNIDIRECTIONAL CONDUCTIVE TAPE- RIGID FLEX TO CATHODE
- MANY PROCEDURES WRITTEN
- April 13 DIS tour - no work in Halld - Need BCAL wedge and solenoid coil
- LCW flow switch trips at 5G field