Difference between revisions of "BLTWG Meeting 04/18/2011"
From GlueXWiki
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
* Time: 11:00 EST | * Time: 11:00 EST | ||
− | * Place: ESNET and EVO (with telephone bridge id | + | * Place: ESNET and EVO (with telephone bridge id 326 5352) |
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Richard J., James M., Alex S., Yi Q., Mark I., Hovanes E., Ivan T., Vitaly B. |
===Agenda=== | ===Agenda=== | ||
Line 8: | Line 8: | ||
# [http://www.jlab.org/~baturin/ASIPM-PMT-COMPARISON-18-APR-2011.pdf Status of the SiPM timing measurements] -- ''V.Baturin/F.Barbosa/S.Somov'' | # [http://www.jlab.org/~baturin/ASIPM-PMT-COMPARISON-18-APR-2011.pdf Status of the SiPM timing measurements] -- ''V.Baturin/F.Barbosa/S.Somov'' | ||
# Discussion on the PS design -- ''Sascha'' | # Discussion on the PS design -- ''Sascha'' | ||
+ | # Upcoming CHESS run April 28 - May 3 -- ''Richard'' | ||
+ | # Progress on analysis of microscope test data -- ''Alex, Richard'' |
Latest revision as of 11:07, 18 April 2011
- Time: 11:00 EST
- Place: ESNET and EVO (with telephone bridge id 326 5352)
- Connecting: instructions are here
- Present: Richard J., James M., Alex S., Yi Q., Mark I., Hovanes E., Ivan T., Vitaly B.
Agenda
- Status of the SiPM timing measurements -- V.Baturin/F.Barbosa/S.Somov
- Discussion on the PS design -- Sascha
- Upcoming CHESS run April 28 - May 3 -- Richard
- Progress on analysis of microscope test data -- Alex, Richard