Difference between revisions of "BLTWG Meeting 06/25/2012"
From GlueXWiki
(→Notes) |
|||
(4 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
* Place: ESNET and EVO (with telephone bridge id 549 9207) | * Place: ESNET and EVO (with telephone bridge id 549 9207) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: | + | * Present: Michael D., Barry R., Dan S., Tim W., Alex S., Liping G., Yi Q., Curtis M., Richard J., Brendan P., Alex B., Fridah M., and Igor S. |
---- | ---- | ||
===Agenda=== | ===Agenda=== | ||
Line 9: | Line 9: | ||
# Report from CUA group -- ''Franz, Alex'' | # Report from CUA group -- ''Franz, Alex'' | ||
# Report from ASU group -- ''Mike'' | # Report from ASU group -- ''Mike'' | ||
+ | # Report from UNCW group -- ''Liping'' | ||
+ | # Discussion with accelerator group on beam parameters -- ''Alex'' | ||
# Progress on UConn construction contract -- ''Alex'' | # Progress on UConn construction contract -- ''Alex'' | ||
#* June 8 -- Issue solicitation | #* June 8 -- Issue solicitation | ||
Line 21: | Line 23: | ||
* Latest news from SINMAT, as of June 20: | * Latest news from SINMAT, as of June 20: | ||
<blockquote> | <blockquote> | ||
− | We have solved the problems etching now. We are trying to | + | We have solved the problems etching now. We are trying to thin down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week's time. |
</blockquote> | </blockquote> |
Latest revision as of 12:24, 27 June 2012
- Time: 11:30 EST
- Place: ESNET and EVO (with telephone bridge id 549 9207)
- Connecting: instructions are here
- Present: Michael D., Barry R., Dan S., Tim W., Alex S., Liping G., Yi Q., Curtis M., Richard J., Brendan P., Alex B., Fridah M., and Igor S.
Agenda
- Announcements
- Report from Glasgow group -- Ken
- Report from CUA group -- Franz, Alex
- Report from ASU group -- Mike
- Report from UNCW group -- Liping
- Discussion with accelerator group on beam parameters -- Alex
- Progress on UConn construction contract -- Alex
- June 8 -- Issue solicitation
- June 23 -- Receive proposals
- Update on diamond radiator fabrication -- Brendan
- Update on microscope construction -- James
- possible loan of DAq system with FADC to UConn
- possible swap of two SIPM's with Jlab (soon?)
Notes
- Latest news from SINMAT, as of June 20:
We have solved the problems etching now. We are trying to thin down. There was a problem with the etching tool. Now it is fixed. I hope to get it thinned in a week's time.