Difference between revisions of "Controls Meeting 28-Jun-2012"
From GlueXWiki
m |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(7 intermediate revisions by one other user not shown) | |||
Line 4: | Line 4: | ||
* Minutes from previous meeting [[Controls_Meeting_14-Jun-2012|14-Jun-2012]] | * Minutes from previous meeting [[Controls_Meeting_14-Jun-2012|14-Jun-2012]] | ||
* CNU summer student projects - Elliott | * CNU summer student projects - Elliott | ||
− | ** | + | ** UPS, RDC and other SNMP programming? |
+ | * [http://halldweb.jlab.org/JInventory JInventory database conventions] - Josh, Elliott | ||
* Barcode scanner - Hovanes, Elliott | * Barcode scanner - Hovanes, Elliott | ||
* Controls hardware requests - Josh | * Controls hardware requests - Josh | ||
− | |||
− | |||
* EPICS - Hovanes, Vanik | * EPICS - Hovanes, Vanik | ||
− | ** alarm system, goniometer, UConn boards, other power supplies, etc. | + | ** motion control, alarm system, goniometer, UConn boards, other power supplies, etc. |
* Counting house installation - Hovanes, Mark | * Counting house installation - Hovanes, Mark | ||
− | * | + | * Solenoid test - Mark, Josh, Scot, Elliott |
− | ** FastTrack, FMEA, UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc. | + | ** FastTrack, OSP's, FMEA, new computers, UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc. |
− | + | ||
− | + | ||
* Test stand - Hovanes, Josh | * Test stand - Hovanes, Josh | ||
* PLC programming and PXI system - Josh, Dave | * PLC programming and PXI system - Josh, Dave | ||
* Elogs and databases - Elliott | * Elogs and databases - Elliott | ||
− | ** [https:// | + | ** [https://halldweb.jlab.org/elog-halld Midas elog] |
** Operator elog | ** Operator elog | ||
− | * [http:// | + | * [http://halldweb.jlab.org/mantisbt Mantis task tracker] |
* Experiment Control Supervisor - Elliott | * Experiment Control Supervisor - Elliott | ||
− | |||
− | |||
Line 46: | Line 41: | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | Present: Elliott W, Josh B, Mark S. | ||
+ | |||
+ | |||
+ | '''This was a fairly short meeting due to many people not being available.''' | ||
+ | |||
+ | |||
+ | |||
+ | * Elliott reported that the summer student will work on communication with the UPS after completing another project, if time permits. | ||
+ | * Josh proposed some conventions for the JInventory database and made a bunch of new entries, some changes will be needed. | ||
+ | * Hovanes received a loaner barcode scanner and is evaluating it. | ||
+ | * Walt Akers may have a source for cheap breakers for the RDC, Mark will followup. | ||
+ | * Josh is ready to order the CompactLogix system, just needs to verify with Jim concerning which RTD they plan to use. | ||
+ | * Vanik implemented pulsed mode in the EPICS driver. | ||
+ | * Mark and Mark Bear are ordering parts for wiring the counting house rack room. | ||
+ | * Elliott is right in the middle of creating a Fastrack schedule for the solenoid test, will need input from everyone. | ||
+ | * We need the OSP for maintenance of the solenoid power supply by the end of July. | ||
+ | * Josh received the second SOE module, he is planning some additional tests. | ||
+ | * Josh started working on Viewpoint screens. | ||
+ | * Josh will order a new quad-core computer for the A-B license servers and other software. | ||
+ | * Dave has been busy recently so not too much progress on PLC programming, but the first version of the module that communicates with the Danfysik supply is ready. | ||
+ | * Josh has completed a lot of PLC programming and is using tasks and programs to simplify the code. |
Latest revision as of 11:35, 31 March 2015
Agenda
- Announcements
- Minutes from previous meeting 14-Jun-2012
- CNU summer student projects - Elliott
- UPS, RDC and other SNMP programming?
- JInventory database conventions - Josh, Elliott
- Barcode scanner - Hovanes, Elliott
- Controls hardware requests - Josh
- EPICS - Hovanes, Vanik
- motion control, alarm system, goniometer, UConn boards, other power supplies, etc.
- Counting house installation - Hovanes, Mark
- Solenoid test - Mark, Josh, Scot, Elliott
- FastTrack, OSP's, FMEA, new computers, UPS power to Danfysik, SOE, QD, overcurrent protection, ground fault detector, etc.
- Test stand - Hovanes, Josh
- PLC programming and PXI system - Josh, Dave
- Elogs and databases - Elliott
- Midas elog
- Operator elog
- Mantis task tracker
- Experiment Control Supervisor - Elliott
Time/Location
9:30 AM Thurs 28-Jun-2012 CC L207
Announcements
Next Meeting
9:30am Thurs 12-Jul-2012 CC L207
Minutes
Present: Elliott W, Josh B, Mark S.
This was a fairly short meeting due to many people not being available.
- Elliott reported that the summer student will work on communication with the UPS after completing another project, if time permits.
- Josh proposed some conventions for the JInventory database and made a bunch of new entries, some changes will be needed.
- Hovanes received a loaner barcode scanner and is evaluating it.
- Walt Akers may have a source for cheap breakers for the RDC, Mark will followup.
- Josh is ready to order the CompactLogix system, just needs to verify with Jim concerning which RTD they plan to use.
- Vanik implemented pulsed mode in the EPICS driver.
- Mark and Mark Bear are ordering parts for wiring the counting house rack room.
- Elliott is right in the middle of creating a Fastrack schedule for the solenoid test, will need input from everyone.
- We need the OSP for maintenance of the solenoid power supply by the end of July.
- Josh received the second SOE module, he is planning some additional tests.
- Josh started working on Viewpoint screens.
- Josh will order a new quad-core computer for the A-B license servers and other software.
- Dave has been busy recently so not too much progress on PLC programming, but the first version of the module that communicates with the Danfysik supply is ready.
- Josh has completed a lot of PLC programming and is using tasks and programs to simplify the code.