Difference between revisions of "Active Collimator Prototyping"
From GlueXWiki
(→Notes from meetings with Accelerator Group) |
|||
Line 9: | Line 9: | ||
* [[media:PMT-5Rresp.png|Measured response spectra in different gain modes]] | * [[media:PMT-5Rresp.png|Measured response spectra in different gain modes]] | ||
− | == | + | == Prototyping Pages== |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
[http://zeus.phys.uconn.edu/halld/collimator/tests-3-2007/request.html Proposal for active collimator parasitic beam test with g13] | [http://zeus.phys.uconn.edu/halld/collimator/tests-3-2007/request.html Proposal for active collimator parasitic beam test with g13] | ||
* [[Installation notes for active collimator beam test 2007]] | * [[Installation notes for active collimator beam test 2007]] |
Latest revision as of 12:07, 8 February 2013
Instrumented Collimator System Design
The instrumented collimator system design summarizes the components and interconnects for a device.
Collimator system design xfig file
The PMT-5R amplifiers and F-100PS power supplies are manufactured by Advanced Research Instruments Corporation.[1]
Prototyping Pages
Proposal for active collimator parasitic beam test with g13
- Installation notes for active collimator beam test 2007
- Results with the active collimator in the Hall B photon beam
- Results from the 2012 Hall B beam test: