Difference between revisions of "March 15, 2013 Installation"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 32: | Line 32: | ||
# Magnet Mapping (Tim) | # Magnet Mapping (Tim) | ||
# CDC and FDC Installation Integration (Curtis, Lubomir, Naomi) | # CDC and FDC Installation Integration (Curtis, Lubomir, Naomi) | ||
− | #* [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install4.jpg Current FDC installation schedule] | + | #* [http://www.jlab.org/Hall-D/detector/fdc/procedures/FDC_install4.jpg Current FDC installation schedule and related activities] |
# FCAL Installation (Matt) | # FCAL Installation (Matt) | ||
# A.O.B. | # A.O.B. | ||
== Minutes == | == Minutes == |
Latest revision as of 12:25, 15 March 2013
Meeting Time and Place
Friday, March 15, 2013 at 1:30 PM At Jefferson Lab, the meeting will be held in F326
Connections
To connect from the outside, please use ESNET
- ) ESNET: 8542553
- )To connect by telephone (supported on request only) dial:
- You can look up toll-free number at http://www.readytalk.com/intl
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call)
- enter access code followed by the # sign: 3421244#
Up to GlueX/Hall-D Installation Meetings
Action Items From Last Meeting
- FDC and CDC will discuss installation details (Lubomir, Curtis, and Naomi)
- Tim will organize solenoid mapping meeting
- Matt and Elton will iterate on FCAL schedule
- Sascha will produce a Wiki page documenting various commissioning trigger configurations
- Matt will contact Fernando so that he can present the electronics schedule at the next meeting (March 15)
Agenda
- Announcements
- Updates to the Mechanical Installation Schedule ( Latest Rendition of Install Schedule) (Tim)
- Electronics Installation Schedule (Fernando)
- Magnet Mapping (Tim)
- CDC and FDC Installation Integration (Curtis, Lubomir, Naomi)
- FCAL Installation (Matt)
- A.O.B.