Difference between revisions of "2014-04-30"
From GlueXWiki
(→Announcements) |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
=== Announcements === | === Announcements === | ||
* [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14 | * [[GlueX-Collaboration-May-2014|Collaboration Meeting]] May 12-14 | ||
+ | * Beam in the tagger "dumplet" | ||
=== Needed Written Material === | === Needed Written Material === | ||
− | * [https:// | + | * [https://halldweb.jlab.org/wiki/index.php/StatusTable TDR Status] |
* [[Summer 2014 Manpower Contributions]] | * [[Summer 2014 Manpower Contributions]] | ||
* [[Private:Service Statements | Service Statements]] | * [[Private:Service Statements | Service Statements]] | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
− | * Calorimeters: | + | * Calorimeters: [[Apr 24, 2014 Calorimetry | April 24, 2014]] |
− | + | ** BCAL | |
− | ** FCAL [https://logbooks.jlab.org/entry/ | + | ** FCAL [https://logbooks.jlab.org/entry/3283640] |
− | * | + | * Tracking [[minutes-4-24-2014|Joint FDC/CDC Meeting Apr. 24, 2014]] |
− | + | ||
** CDC | ** CDC | ||
** FDC | ** FDC | ||
+ | ** FADC FPGA [[FADC_Data_Format_Apr_22,_2014 |April 22, 2014]] | ||
* PID | * PID | ||
− | ** TOF [[GlueX TOF Meeting, April | + | ** TOF [[GlueX TOF Meeting, April 24, 2014|April 10, 2014]] |
− | ** Start Counter [[GlueX Start Counter Meeting, April | + | ** Start Counter [[GlueX Start Counter Meeting, April 17, 2014#Minutes|April 3, 2014]] |
− | ** PID Upgrades [[ | + | ** PID Upgrades [[April 25, 2014 PID Upgrade|May 2, 2014]] |
* Engineering | * Engineering | ||
** Magnets | ** Magnets | ||
** Target | ** Target | ||
** Engineering Activities | ** Engineering Activities | ||
− | ** Installation | + | ** Installation |
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
− | ** Hardware (Level-1) [[OWG Meeting | + | ** Hardware (Level-1) [[OWG Meeting 23-Apr-2014 |April 23, 2014]] |
** Software (Level-3) [[February 4, 2014| February 4, 2014]] | ** Software (Level-3) [[February 4, 2014| February 4, 2014]] | ||
− | * DAQ/Monitoring/Controls [[OWG Meeting | + | * DAQ/Monitoring/Controls [[OWG Meeting 23-Apr-2014 |April 23, 2014]] |
* Offline Software | * Offline Software | ||
− | ** Offline [[GlueX Offline Meeting, April | + | ** Offline [[GlueX Offline Meeting, April 16, 2014|April 16, 2014]] |
** Data Challenge Meeting [[GlueX Data Challenge Meeting, April 11, 2014|April 11, 2014]] | ** Data Challenge Meeting [[GlueX Data Challenge Meeting, April 11, 2014|April 11, 2014]] | ||
− | + | ** Calibration [[April 23, 2014 Calibration| April 23, 2014]] | |
− | + | * Photon Beam and Tagger [[BLTWG Meeting 04/28/2014|April 28, 2014]] | |
− | + | * Physics [[April 21, 2014, Physics Working Group|April 21, 2014]] | |
− | ** Calibration [[April | + | |
− | * Photon Beam and Tagger [[BLTWG Meeting 04/ | + | |
− | * Physics [[April | + |
Latest revision as of 10:51, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday April 30, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Collaboration Meeting May 12-14
- Beam in the tagger "dumplet"
Needed Written Material
Reports from Technical Groups
- Calorimeters: April 24, 2014
- BCAL
- FCAL [2]
- Tracking Joint FDC/CDC Meeting Apr. 24, 2014
- CDC
- FDC
- FADC FPGA April 22, 2014
- PID
- TOF April 10, 2014
- Start Counter April 3, 2014
- PID Upgrades May 2, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) April 23, 2014
- Software (Level-3) February 4, 2014
- DAQ/Monitoring/Controls April 23, 2014
- Offline Software
- Offline April 16, 2014
- Data Challenge Meeting April 11, 2014
- Calibration April 23, 2014
- Photon Beam and Tagger April 28, 2014
- Physics April 21, 2014