Difference between revisions of "2014-08-06"
From GlueXWiki
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki") |
|||
(8 intermediate revisions by 4 users not shown) | |||
Line 22: | Line 22: | ||
* Technical Construction Report | * Technical Construction Report | ||
** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ** [https://userweb.jlab.org/~gen/tcr.pdf TCR Report] | ||
− | **[https:// | + | **[https://halldweb.jlab.org/wiki/index.php/StatusTable TCR Status] |
* Solenoid Current Studies | * Solenoid Current Studies | ||
* Readiness Reviews. | * Readiness Reviews. | ||
** Accelerator Readiness Review August 2014 | ** Accelerator Readiness Review August 2014 | ||
− | * [https:// | + | * [https://halldweb.jlab.org/hdops/wiki/index.php/Hall_D_Commissioning Commissioning Plans] |
* PAC Proposals | * PAC Proposals | ||
** [[PAC Proposals| Submitted]] | ** [[PAC Proposals| Submitted]] | ||
Line 40: | Line 40: | ||
** CDC | ** CDC | ||
** FDC | ** FDC | ||
− | ** FADC FPGA [[ | + | ** FADC FPGA [[FADC_Data_Format_July_22,_2014 |July 22, 2014]] |
* PID | * PID | ||
** TOF [[GlueX TOF Meeting, August 5, 2014|August 5, 2014]] | ** TOF [[GlueX TOF Meeting, August 5, 2014|August 5, 2014]] | ||
Line 46: | Line 46: | ||
** Start Counter [[GlueX Start Counter Meeting, July 24, 2014#Minutes|July 24, 2014]] | ** Start Counter [[GlueX Start Counter Meeting, July 24, 2014#Minutes|July 24, 2014]] | ||
** PID Upgrades [[August 1, 2014 PID Upgrade|August 1, 2014]] | ** PID Upgrades [[August 1, 2014 PID Upgrade|August 1, 2014]] | ||
+ | * DAQ/Monitoring/Controls [[OWG Meeting 30-Jul-2014 |July 30, 2014]] | ||
* Engineering | * Engineering | ||
** Magnets | ** Magnets | ||
Line 52: | Line 53: | ||
** Installation | ** Installation | ||
* Electronics | * Electronics | ||
− | |||
* Trigger | * Trigger | ||
** Hardware (Level-1) [[OWG Meeting 30-Jul-2014 |July 30, 2014]] | ** Hardware (Level-1) [[OWG Meeting 30-Jul-2014 |July 30, 2014]] |
Latest revision as of 21:32, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday August 6, 2014 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
Ongoing Activities
- Technical Construction Report
- Solenoid Current Studies
- Readiness Reviews.
- Accelerator Readiness Review August 2014
- Commissioning Plans
- PAC Proposals
- Submitted
- Presentations at PAC Meeting
- DIRC Updates
Reports from Technical Groups
- Calorimeters: July 31, 2014
- FCAL
- BCAL - BCAL Logbook
- BCAL Reconstruction June 26, 2014
- Tracking Joint FDC/CDC Meeting July 31, 2014
- CDC
- FDC
- FADC FPGA July 22, 2014
- PID
- TOF August 5, 2014
- [ https://logbooks.jlab.org/entry/3289258 Logbook entry of TOF cosmic trigger]
- Start Counter July 24, 2014
- PID Upgrades August 1, 2014
- TOF August 5, 2014
- DAQ/Monitoring/Controls July 30, 2014
- Engineering
- Magnets
- Target
- Engineering Activities
- Installation
- Electronics
- Trigger
- Hardware (Level-1) July 30, 2014
- Software (Level-3) June 10, 2014
- Offline Software
- Offline July 23, 2014
- Calibration July 30, 2014
- Photon Beam and Tagger August 4, 2014
- Physics July 28, 2014