Difference between revisions of "BLTWG Meeting 09/15/2014"
From GlueXWiki
(→Organization) |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 6: | Line 6: | ||
** phone: 408-740-7256 or 888-240-2560 | ** phone: 408-740-7256 or 888-240-2560 | ||
* Conference id: 536076821 | * Conference id: 536076821 | ||
− | * Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., and Todd S. | + | * Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., Barry R., Eugene C., Alex S., and Todd S. |
=== Agenda === | === Agenda === | ||
Line 12: | Line 12: | ||
# [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] | # [[GlueX-Collaboration-Oct-2014|Collaboration Meeting]] | ||
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.'' | # Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.'' | ||
− | # [https:// | + | # [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Richard J.'' |
− | # Shift schedule review | + | # [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review] |
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.'' | # [[Beam Simulations|Tagger hall simulations]] - ''Richard J.'' | ||
# Tagger hall configuration during initial beam tune - ''discussion'' | # Tagger hall configuration during initial beam tune - ''discussion'' | ||
Line 21: | Line 21: | ||
# Report on active collimator setup and tests - ''Alex B.'' | # Report on active collimator setup and tests - ''Alex B.'' | ||
# Report on pair spectrometer setup and tests - ''Alex S.'' | # Report on pair spectrometer setup and tests - ''Alex S.'' | ||
− | #* [https:// | + | #* [https://halldweb.jlab.org/wiki/index.php/Field_stability_study Pair spectrometer field stability study] - ''Alexandre D.'' |
# Report on diamond milling and mount construction - ''Brendan P'' | # Report on diamond milling and mount construction - ''Brendan P'' | ||
# Report on polarimeter construction - ''Michael D'' | # Report on polarimeter construction - ''Michael D'' |
Latest revision as of 04:15, 1 April 2015
Organization
- Time: 11:30 EST, pre-meeting at 11:00 EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
- Present: Richard J., Alex B., Brendan P., James M., Natalie W., Franz K., Nathan S., Barry R., Eugene C., Alex S., and Todd S.
Agenda
- Announcements
- Collaboration Meeting
- Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
- Photon beam commissioning plan overview - Richard J.
- Shift schedule review
- Tagger hall simulations - Richard J.
- Tagger hall configuration during initial beam tune - discussion
- Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
- Report on tagger microscope setup and tests in ESB - James M, Alex B.
- Report on active collimator setup and tests - Alex B.
- Report on pair spectrometer setup and tests - Alex S.
- Pair spectrometer field stability study - Alexandre D.
- Report on diamond milling and mount construction - Brendan P
- Report on polarimeter construction - Michael D