− | [https:// | + | [https://halldweb.jlab.org/wiki/index.php/Trigger_Commissioning Trigger Commissioning Plan] |
+ | |||
+ | * CTP installation and testing | ||
+ | |||
+ | * Test of the global trigger distribution (using BCAL north crates) | ||
+ | |||
+ | :* Global energy sum | ||
+ | |||
+ | :* [[Media:C3_cosm_examp.png | BCAL cosmic trigger]] | ||
+ | |||
+ | * BCAL cosmic trigger for FDC / CDC | ||
+ | |||
+ | * Trigger calibration status from sub-detectors | ||
+ | |||
+ | :* TAGM/TAGH setups | ||
+ | |||
+ | :* Start Counter | ||
+ | |||
+ | :* Pair Spectrometer | ||
+ | |||
+ | * Trigger monitoring |
Latest revision as of 06:51, 1 April 2015
- CTP installation and testing
- Test of the global trigger distribution (using BCAL north crates)
- Global energy sum
- BCAL cosmic trigger for FDC / CDC
- Trigger calibration status from sub-detectors
- TAGM/TAGH setups
- Start Counter
- Pair Spectrometer
- Trigger monitoring