Line 27: | Line 27: | ||
* Include resolution material from the prototype work | * Include resolution material from the prototype work | ||
+ | |||
+ | * Include description of how dE/dx is done and where we are with the prototype. | ||
* Include discussion of noise reduction and identified issues in the prototype. | * Include discussion of noise reduction and identified issues in the prototype. |
Latest revision as of 11:27, 15 February 2008
Work that needs to be done to update the CDC documentation:
The starting point for these updates are The GlueX Central Drift Chamber (Document 744 02/07), CDC Design Layout (Document 979 02/08), The CDC High-Voltage Board (Document 928 12/07) and Budget Justifications for the GlueX CDC (Document 764 07/07). We will produce a new document with material lifted from earlier documents and updated.
- A section detailing the design changes that have been made ove the last year with a description of why they were made.
- Chamber went from 1.75m to 1.50m
- Remove the outermost layer to allow cable space.
- Wire pattern changed because of these changes.
- Added 2 mil padding between straws.
- Thinned the material in the down stream endplate.
- Proof-of-principle plan for mounting the electronics on the plenum
- Update the geometry section to be compatible with document 949.
- Update the electronics section to include material from document 928.
- Include discussion of feed through options. What works now and the option with potted connectors we are now investigating.
- Update Construction section with more details on alignment during construction as well as a discusion of the measurement of where the wires are located.
- Include material on track finding and reconstruction in the prototype.
- Include resolution material from the prototype work
- Include description of how dE/dx is done and where we are with the prototype.
- Include discussion of noise reduction and identified issues in the prototype.
- Include plan of work for the next 6-9 months
- Include manpower plan for construction?