Difference between revisions of "Run Planning Meeting Notes, April 19-April 25, 2016"
From GlueXWiki
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
|||
(16 intermediate revisions by 4 users not shown) | |||
Line 5: | Line 5: | ||
− | == | + | ==Monday, April 25== |
# Accelerator Status | # Accelerator Status | ||
− | |||
# Hall-D/GlueX items | # Hall-D/GlueX items | ||
#* Running overnight | #* Running overnight | ||
− | #** ABUs | + | #** ABUs 16.9 hours in 3 shifts |
− | #*** | + | #*** 307 mins day, 403 mins swing, 304 mins owl |
− | #*** | + | #** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs) |
− | #*** 366 mins owl | + | #**[https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2994 Run Statistics] |
− | #** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] | + | #*** Total at 1345 A: 4 G trigs at (15 % of total) |
+ | #* Trigger studies | ||
+ | #** 5 runs (470 M trigs) which also include new trigger | ||
+ | # Access to Hall | ||
+ | #** Controlled access Monday | ||
+ | #** Administrative controls through Thursday | ||
+ | # Offline Analysis? | ||
+ | #* [https://logbooks.jlab.org/entry/3402819 Event parsing speed] | ||
+ | #* [https://logbooks.jlab.org/entry/3402778 Higher width in PERP] | ||
+ | #* [https://logbooks.jlab.org/entry/3402982 Beam bleed-through from FFT of event data] | ||
+ | # Any Other Business? | ||
+ | |||
+ | ==Sunday, April 24== | ||
+ | # Accelerator Status | ||
+ | #* Beam gone most of Day Shift, back at about 6 pm. | ||
+ | # Hall-D/GlueX items | ||
+ | #* Running overnight | ||
+ | #** ABUs 10.4 hours in 3 shifts | ||
+ | #*** 55 mins day, 202 mins swing, 366 mins owl | ||
+ | #** [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1755888890 Triggers] (PARA 342 M trigs, PERP 299 M trigs) | ||
#* mode 8 current scan | #* mode 8 current scan | ||
#* [https://logbooks.jlab.org/entry/3402377 Beam profiler survey] | #* [https://logbooks.jlab.org/entry/3402377 Beam profiler survey] | ||
− | |||
− | |||
#* Trigger studies (2 hours) | #* Trigger studies (2 hours) | ||
+ | #** 2 runs which also include new trigger | ||
+ | #* [https://logbooks.jlab.org/entry/3402661 TAGM alignment initial results] | ||
# Upcoming Run Plan | # Upcoming Run Plan | ||
#* Production 50 um | #* Production 50 um | ||
Line 26: | Line 44: | ||
#* [https://logbooks.jlab.org/entry/3402477 very rough cross section estimates for rho production from run 11450] | #* [https://logbooks.jlab.org/entry/3402477 very rough cross section estimates for rho production from run 11450] | ||
# Any Other Business? | # Any Other Business? | ||
− | |||
− | |||
==Saturday, April 23== | ==Saturday, April 23== |
Latest revision as of 17:13, 24 February 2017
- View Runplan google calendar
- Edit Runplan google calendar
- MCC white board
- Spreadsheet: number of triggers
Contents
Monday, April 25
- Accelerator Status
- Hall-D/GlueX items
- Running overnight
- ABUs 16.9 hours in 3 shifts
- 307 mins day, 403 mins swing, 304 mins owl
- Triggers (PARA 450 M trigs, PERP 640 M trigs, unpolarized 326 M trigs)
- Run Statistics
- Total at 1345 A: 4 G trigs at (15 % of total)
- ABUs 16.9 hours in 3 shifts
- Trigger studies
- 5 runs (470 M trigs) which also include new trigger
- Running overnight
- Access to Hall
- Controlled access Monday
- Administrative controls through Thursday
- Offline Analysis?
- Any Other Business?
Sunday, April 24
- Accelerator Status
- Beam gone most of Day Shift, back at about 6 pm.
- Hall-D/GlueX items
- Running overnight
- ABUs 10.4 hours in 3 shifts
- 55 mins day, 202 mins swing, 366 mins owl
- Triggers (PARA 342 M trigs, PERP 299 M trigs)
- ABUs 10.4 hours in 3 shifts
- mode 8 current scan
- Beam profiler survey
- Trigger studies (2 hours)
- 2 runs which also include new trigger
- TAGM alignment initial results
- Running overnight
- Upcoming Run Plan
- Production 50 um
- Offline Analysis?
- Any Other Business?
Saturday, April 23
- Accelerator Status
- Beam gone for various reasons Friday afternoon. Came back ~19:30
- Hall-D/GlueX items
- Upcoming Run Plan
- Mode 8 (raw mode) running for Lubomir
- Production 50 um
- Offline Analysis?
- Any Other Business?
Friday, April 22
- Accelerator Status
- Running smoothly
- Hall-D/GlueX items
- Running overnight
- ABUs 15.6 hours in 3 shifts, 65% (280 mins Day, 324 mins Swing, 334 mins Owl)
- Triggers (PARA 473M trigs, PERP 303 M trigs, unpolarizad 130 M trigs)
- Magnet ramped to 1350
- Centered on Active Collimator
- new DAC values for BCAL, FCAL, CDC
- We are running PARA 80 nA and PERP 120 nA in order to get 30 kHz of rate. Do we want to go higher?
- Monitoring logbook sometime missing plots eg1 eg2
- Microscope gain have been balanced
- PS harp scan with 5mm hole
- Trigger studies (3 hours)
- Report on TRD studies
- MO prescale factor issues
- Running overnight
- Run Plan
- Production 50 um
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- Mode 8 (raw mode) running ??
- Offline Analysis?
- Any Other Business?
Thursday, April 21
- Accelerator Status
- Running smoothly, harps scan a little bit larger
- Hall-D/GlueX items
- Running overnight
- ABUs 7.8 hours in 3 shifts
- Triggers (PARA 150M trigs, PERP 150 M trigs, unpolarizad 120 M trigs)
- TRD studies
- Run Statistics
- Hall D access Wednesday 20 April.
- Microscope gain balancing (has this been implemented??)
- Report on TRD studies TRD runs
- Running overnight
- Run Plan
- PS harp scan with 5mm hole during magnet ramp
- Trigger studies
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- Production 50 um
- Mode 8 (raw mode) running
- Offline Analysis?
- Any Other Business?
Wednesday, April 20
- Accelerator Status
- Overnight running (reasonably good, lost time for orbit issues due to the Hall A beam and ion chamber issues in the north linac.
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Hall-D/GlueX items
- Running overnight
- ABUs 14.8 hours in 3 shifts (day 371 mins, Swing 320 mins, owl 200 mins)
- Triggers (PARA 354M trigs, PERP 375 M trigs)
- High luminosity tests (30 minutes), trigger studies (4 hours)
- Run Statistics
- Hall D access Wednesday 20 April.
- RadCon has been contacted.
- Access possible in the morning
- Beam studies in the afternoon (upstream slow locks)
- Walkthrough (Hall and Tagger)
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Microscope gain balancing
- Report on Trigger studies
- Report on TRD studies
- Latest Occupancy Plots look reasonable??
- "20 micron" diamond radiator thicknesses
- Running overnight
- Run Plan
- Mode 8 (raw mode) running with cosmics during access
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Friday ?)
- TAGM alignment (Friday ?)
- PS harp scan with 5mm hole
- Offline Analysis?
- Any Other Business?
Tuesday, April 19
- Accelerator Status
- Running overnight
- ABUs 16.4 hours in 3 shifts (309 + 328 + 349 minutes)
- Triggers (PARA 462 M, PERP 597 M, Unpolarized 150 M)
- Scheduled accelerator down on Wednesday 20 April (7 am - 6 pm)
- RF recovery, beam studies, Hall A pass change
- Running overnight
- Hall-D/GlueX items
- Report on Trigger studies
- Report on TRD studies
- Hall D access Wednesday 20 April.
- Access possible throughout Day and into Swing, starting about 8 am. RadCon has been contacted.
- No tagger access required???
- Collimator work
- TRD work
- Magnet work
- FCAL bases exchange
- Latest Occupancy Plots look reasonable
- Run Statistics
- Run Plan
- Production 50 um
- Trigger studies
- TRD studies
- Empty Target run with 5 mm hole (Thursday ?)
- TAGM alignment (Thursday ?)
- Mode 8 (raw mode) running?
- Para/Perp luminosity studies?
- Offline Analysis?
- Any Other Business?