Difference between revisions of "June 17, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(One intermediate revision by one other user not shown) | |||
Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
− | #* [ | + | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2996 Bar box shipping document] sent to Jerry, Blair and JLab management (John and Matt) |
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3070 DIRC2015 Proceedings] | ||
# Optical box design update (MIT) | # Optical box design update (MIT) | ||
#* [https://gluexdirc.mit.edu/window-material Window material study] (Maria) | #* [https://gluexdirc.mit.edu/window-material Window material study] (Maria) | ||
Line 24: | Line 25: | ||
# [https://gluexdirc.mit.edu/expected-distributions Expected Occupancies] (John H) | # [https://gluexdirc.mit.edu/expected-distributions Expected Occupancies] (John H) | ||
# [https://halldweb.jlab.org/wiki/index.php/File:FIFTH_DISCUSSION.pptx Support structure design update (IU)] | # [https://halldweb.jlab.org/wiki/index.php/File:FIFTH_DISCUSSION.pptx Support structure design update (IU)] | ||
+ | # Preliminary discussion of CUA contributions (Greg) | ||
# [[DIRC Planning for FY16|Planning for FY16]] | # [[DIRC Planning for FY16|Planning for FY16]] | ||
# AOB | # AOB |
Latest revision as of 17:13, 24 February 2017
Meeting Information
GlueX PID Upgrade Meeting
Friday, June 3, 2016
11 am, EDT
JLab room F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Bar box shipping document sent to Jerry, Blair and JLab management (John and Matt)
- DIRC2015 Proceedings
- Optical box design update (MIT)
- Window material study (Maria)
- Update on the cookies (Maria)
- Expected Occupancies (John H)
- Support structure design update (IU)
- Preliminary discussion of CUA contributions (Greg)
- Planning for FY16
- AOB