Difference between revisions of "October 21, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
|||
(6 intermediate revisions by 2 users not shown) | |||
Line 19: | Line 19: | ||
#* Evaluate bar boxes: check dimensions relative to drawings, replacement of rollers, flexibility of boot... | #* Evaluate bar boxes: check dimensions relative to drawings, replacement of rollers, flexibility of boot... | ||
#* Evaluate water system: modification for distilled water, replacement of components (filters, UV lamps, etc.), compatibility with other Hall D systems... | #* Evaluate water system: modification for distilled water, replacement of components (filters, UV lamps, etc.), compatibility with other Hall D systems... | ||
+ | #* [[List of SLAC items | SLAC List]] | ||
#* Questions to discuss with Jerry, et al. | #* Questions to discuss with Jerry, et al. | ||
# Support structure design update | # Support structure design update | ||
Line 24: | Line 25: | ||
#* [https://halldweb.jlab.org/wiki/images/6/6b/Clearance_on_mirror_box_opening.pdf Clearance on mirror box opening] (John, All) | #* [https://halldweb.jlab.org/wiki/images/6/6b/Clearance_on_mirror_box_opening.pdf Clearance on mirror box opening] (John, All) | ||
# Optical box design update | # Optical box design update | ||
− | #* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2016-October/000260.html Optical cookies production and testing plans] Maria | + | #* [https://halldweb.jlab.org/wiki/index.php/File:2016-10-21_DIRC_Telecon_Bessuille.pdf Presentation] (Jason) |
− | # | + | #* [https://mailman.jlab.org/pipermail/halld-pid-upgrade/2016-October/000260.html Optical cookies production and testing plans] (Maria) |
− | # | + | #* [https://www.dropbox.com/s/g1g3snwcydcx23h/Cookies2.pdf?dl=0 Presentation] (Maria) |
+ | # Electronics update | ||
+ | # MAPMT requirements beyond standard specs: | ||
#* [http://www.hamamatsu.com/resources/pdf/etd/H12700_TPMH1348E.pdf Hamamatsu default H12700 specs] | #* [http://www.hamamatsu.com/resources/pdf/etd/H12700_TPMH1348E.pdf Hamamatsu default H12700 specs] | ||
+ | #* CLAS RICH special requirements: 5nA dark current max and overall gain > 10<sup>6</sup> | ||
#* [https://halldweb.jlab.org/wiki/images/6/67/H12700.pdf CLAS RICH measured performance] | #* [https://halldweb.jlab.org/wiki/images/6/67/H12700.pdf CLAS RICH measured performance] | ||
# AOB | # AOB |
Latest revision as of 10:52, 31 October 2016
Meeting Information
GlueX DIRC Meeting
Friday October 21, 2016
11:45 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Travel to SLAC:
- Evaluate bar boxes: check dimensions relative to drawings, replacement of rollers, flexibility of boot...
- Evaluate water system: modification for distilled water, replacement of components (filters, UV lamps, etc.), compatibility with other Hall D systems...
- SLAC List
- Questions to discuss with Jerry, et al.
- Support structure design update
- Status of drawing package (John, Stephanie)
- Clearance on mirror box opening (John, All)
- Optical box design update
- Presentation (Jason)
- Optical cookies production and testing plans (Maria)
- Presentation (Maria)
- Electronics update
- MAPMT requirements beyond standard specs:
- Hamamatsu default H12700 specs
- CLAS RICH special requirements: 5nA dark current max and overall gain > 106
- CLAS RICH measured performance
- AOB