Difference between revisions of "December 2, 2016 PID Upgrade"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Friday December 2, 2016<br> 11:00 am, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room...") |
(→Agenda) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 21: | Line 21: | ||
#* Cookie transparency tests (Maria, John) | #* Cookie transparency tests (Maria, John) | ||
# Shipping/property transfer update | # Shipping/property transfer update | ||
− | #* Monitoring of bar boxes in transit (Greg) | + | #* [https://halldweb.jlab.org/wiki/index.php/File:MonitoringBars.pdf Monitoring of bar boxes in transit] (Greg) |
# Water system update (Tim) | # Water system update (Tim) | ||
# AOB | # AOB |
Latest revision as of 11:32, 2 December 2016
Meeting Information
GlueX DIRC Meeting
Friday December 2, 2016
11:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Support structure design update
- Optical box design update
- New diaphragm design (Jason)
- Cookie transparency tests (Maria, John)
- Shipping/property transfer update
- Water system update (Tim)
- AOB