− | The tentative agenda:
| + | === [[KL Minutes 2016 | All meetings in 2016]] === |
| | | |
− | 1) Our schedule for the proposal (back in time):
| + | * [[December 7th, 2016]] |
− | | + | |
− | - We may expect that PAC will be scheduled for July.
| + | |
− | | + | |
− | - We have to submit our proposal 6 weeks in advance (May-June).
| + | |
− | | + | |
− | - It will probably take 4 weeks for the GlueX Collaboration to review (April-May).
| + | |
− | | + | |
− | - In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).
| + | |
− | | + | |
− | - GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
| + | |
− | | + | |
− | 2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
| + | |
− | | + | |
− | 3) Put the right LH2 target and beamline into GlueX MC.
| + | |
− | | + | |
− | 4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc.
| + | |
− | Simulate the interactions of the K0 and n in the material of the GlueX setup.
| + | |
− | | + | |
− | -- ds/dO for KLp-->K+n (Mikhail).
| + | |
− | | + | |
− | -- ds/dO and Sigma for KLp-->K+Xi (Nick).
| + | |
− | | + | |
− | -- ds/dO for xxx ?
| + | |
− | | + | |
− | 5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target.
| + | |
− | | + | |
− | 6) Status of neutron background simulations (Igor) [[https://halldweb.jlab.org/wiki/images/6/68/KL.pdf]]
| + | |
− | | + | |
− | 7) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
| + | |
− | | + | |
− | 8) Schedule for the next meeting.
| + | |
− | | + | |
− | 9) etc.
| + | |