+ | ==Wednesday, February 22 == | ||
+ | # Accelerator Status over the last 24 hrs | ||
+ | #* We got beam back at 5pm after beam studies | ||
+ | #* Hall D switched from zero crossing to RF extracted [https://logbooks.jlab.org/entry/3460987] [https://logbooks.jlab.org/entry/3460994] | ||
+ | #* No downtime incidents of more than 30 minutes after 8 hrs of beam studies | ||
+ | #* Harp scans: [https://logbooks.jlab.org/entry/3461066 5C11](MCC), [https://logbooks.jlab.org/entry/3461067 5C11B](MCC), [https://logbooks.jlab.org/entry/3461084 Radiator] | ||
+ | #** (Sigma_X,Sigma_Y) for this scan: (1.10, 0.39), (0.87, 0.20), (0.76, 0.12) | ||
+ | #** Previous scan from Feb 18: (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18). | ||
+ | #** Beam becomes wider in X and narrower in Y | ||
+ | #** [https://logbooks.jlab.org/entry/3461097 Analysis of the latest scan] by Hovanes | ||
+ | # Hall-D/GlueX items | ||
+ | #* In the last 24 hours: | ||
+ | #** ABU 12.37 hrs (1.5 + 4.53 + 6.34), BANU 1.53 hrs (0.17 + 0.82 + 0.54) | ||
+ | #** Total triggers collected: 1084 M | ||
+ | #* Alex B. did [https://logbooks.jlab.org/entry/3461088 TAGM dark rates] study | ||
+ | #* 1 hour (33M) empty target run, and 0.5hrs of run with target being filled | ||
+ | # Issues | ||
+ | #* Program crashes/restarts: | ||
+ | #** DAQ - 2 (0 + [https://logbooks.jlab.org/entry/3461161 1] + 1); | ||
+ | #** RootSpy - 1 ([https://logbooks.jlab.org/entry/3461181 1] + 0 + 0) | ||
+ | #** elog and shift checklist were down for 2 hours tonight [https://logbooks.jlab.org/entry/3461227] | ||
+ | #** gluon01 hanging on shift checklist print [https://logbooks.jlab.org/entry/3461192] | ||
+ | # Monitoring | ||
+ | #* [https://logbooks.jlab.org/entry/3461186 Trig4:PS] | ||
+ | #* [https://logbooks.jlab.org/entry/3461238 Low level monitoring report] | ||
+ | # Run Plan | ||
+ | #* Production | ||
+ | #* Trigger studies? | ||
+ | #* Hall A bleadthrough measurement | ||
+ | # Offline Analysis? | ||
+ | #* [https://logbooks.jlab.org/entry/3460909 FCAL calibration] | ||
+ | #* [https://logbooks.jlab.org/entry/3461002 Beam energy so far] | ||
+ | #* [https://logbooks.jlab.org/entry/3461150 Beam trip map for reconstruction] | ||
+ | #* [https://logbooks.jlab.org/entry/3461133 Comparison of 100nA/150nA reconstruction] | ||
+ | # Any Other Business? | ||
+ | |||
+ | |||
+ | ==Tuesday, February 21 == | ||
+ | # Accelerator Status over the last 24 hrs | ||
+ | #* Beam was stable when available, with some X variations at AD00C [https://logbooks.jlab.org/entry/3460753] | ||
+ | #** MCC did pathlength checks [https://logbooks.jlab.org/entry/3460807] | ||
+ | #** NOTE: PSC coincidence with amorphous is ~1,400 while it is ~2,300 with a diamond | ||
+ | #** 1 downtime incident of more than 30 minutes: | ||
+ | #*** Energy change in SL, failed controls on 2L21-6 (2 hrs 20 min) [https://logbooks.jlab.org/entry/3460784] | ||
+ | #* Beam studies today from 9 AM to 5 PM | ||
+ | #** No Hall access during beam studies | ||
+ | #** Our target will be emptied | ||
+ | #* Harp scan on Saturday: | ||
+ | # Hall-D/GlueX items | ||
+ | #* In the last 24 hours: | ||
+ | #** ABU 15.25 hrs (5.69 + 6.08 + 3.48), BANU 2.91 hrs (1.55 + 0.90 + 0.46) | ||
+ | #** Total triggers collected: 1650 M | ||
+ | #* [https://logbooks.jlab.org/entry/3460609 Solenoid Nitrogen liquid level alarm] | ||
+ | #* [https://logbooks.jlab.org/entry/3460775 Upper bubbler is nearing its low level] | ||
+ | #* [https://logbooks.jlab.org/entry/3460809 Prolonged FDC voltage alarm] | ||
+ | #* 2 additional parasitic TRD runs. | ||
+ | # Issues | ||
+ | #* Program crashes/restarts: DAQ - 4 (3 + 1 + 0); RootSpy - 1 (0 + 0 + 1) | ||
+ | # Monitoring | ||
+ | #* Reinstalled PS reference plot [https://logbooks.jlab.org/entry/3460545] | ||
+ | #* Do we need different reference plots for amorphous runs? [https://logbooks.jlab.org/entry/3460564] [https://logbooks.jlab.org/entry/3460557] | ||
+ | #* [https://logbooks.jlab.org/entry/3460860 Low level monitoring report] | ||
+ | # Run Plan | ||
+ | #* Production until beam studies start | ||
+ | #* Start emptying the target | ||
+ | #* Harp scans upon return of the beam | ||
+ | #* Empty target run (1 hour) | ||
+ | #* A special run with target being filled | ||
+ | #* And back to production... | ||
+ | #* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2017_Run#Runplan_time_charts Run Plan] | ||
+ | # Offline Analysis? | ||
+ | #* [https://logbooks.jlab.org/entry/3460695 F1TDC shift study] | ||
+ | # Any Other Business? | ||
+ | |||
+ | |||
+ | ==Monday, February 20 == | ||
+ | # Accelerator Status over the last 48 hrs | ||
+ | #* Beam was mostly stable but with some increase in trip frequency [https://logbooks.jlab.org/entry/3460400] [https://logbooks.jlab.org/entry/3460070] | ||
+ | #** Apparently, to turn on/off Hall A beam, our beam has to be taken down as well for a few minutes | ||
+ | #** 2 downtime incidents of more than 30 minutes on Saturday: | ||
+ | #*** Continuation of 1L23 issue Sat morning (1.5 hrs) [https://logbooks.jlab.org/entry/3459691] | ||
+ | #*** Work on 5th pass separator on Sat (42min) [https://logbooks.jlab.org/entry/3459780] | ||
+ | #** No significant accelerator downtime on Sunday | ||
+ | #* Beam studies tomorrow: either 9:00-14:00, or 14:00-17:00 | ||
+ | #* Harp scan on Saturday: | ||
+ | #** MCC scans at [https://logbooks.jlab.org/entry/3459713 5C11] and [https://logbooks.jlab.org/entry/3459717 5C11B] and our scan at [https://logbooks.jlab.org/entry/3459721 radiator] | ||
+ | #*** (Sigma_X, Sigma_Y) is (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18). This is consistent with the previous scan 2 days ago. | ||
+ | # Hall-D/GlueX items | ||
+ | #* In the last 48 hours: | ||
+ | #** Feb 18: ABU 14.60 hrs (2.74 + 6.11 + 5.76), BANU 3.24 hrs (2.05 + 0.74 + 0.45) | ||
+ | #** Feb 19: ABU 18.22 hrs (5.92 + 6.06 + 6.24), BANU 2.42 hrs (0.70 + 0.83 + 0.89) | ||
+ | #** Feb 18: Total triggers collected: 1648 M | ||
+ | #** Feb 19: Total triggers collected: 1720 M | ||
+ | #* 2 parasitic TRD runs have been taken with different radiators. | ||
+ | #* Trigger studies were performed by Sascha both on Saturday and Sunday | ||
+ | # Issues | ||
+ | #* Once, the goniometer got stuck moving, and Hovanes had to fix it [https://logbooks.jlab.org/entry/3459894] | ||
+ | #* May be, related to the above - "unknown" diamond orientation [https://logbooks.jlab.org/entry/3460453] | ||
+ | #* Puzzling CSS problem with TOF FADC scalers: [https://logbooks.jlab.org/entry/3460447] | ||
+ | #* RootSpy issues: | ||
+ | #** "Reset" did not reset all histograms [https://logbooks.jlab.org/entry/3459921] [https://logbooks.jlab.org/entry/3459926] - Fixed by David | ||
+ | #** No reset of normalization for pi0 plot at "reset" [https://logbooks.jlab.org/entry/3459948] - Fixed by David | ||
+ | #** Run number on the HDMONITOR elog plots [https://logbooks.jlab.org/book/hdmonitor] is getting stuck sometimes [https://logbooks.jlab.org/entry/3460032] | ||
+ | #*** Run number is now printed on the plots | ||
+ | #* DAQ issues: | ||
+ | #** Zero counting rate for some ROCs [https://logbooks.jlab.org/entry/3460034] while occupancy plots are normal | ||
+ | #** Sergey did ~30 min of DAQ testing during on Saturday | ||
+ | # Monitoring | ||
+ | #* New PSC reference plot [https://logbooks.jlab.org/entry/3459853] [https://logbooks.jlab.org/entry/3460014] | ||
+ | #* New FDC reference plot [https://logbooks.jlab.org/entry/3460009] | ||
+ | #* New holes in FCAL occupancy [https://logbooks.jlab.org/entry/3460016] | ||
+ | #* [https://logbooks.jlab.org/entry/3460112 Low level monitoring report] (Feb 19) | ||
+ | #* [https://logbooks.jlab.org/entry/3460499 Low level monitoring report] (Feb 20) | ||
+ | # Run Plan | ||
+ | #* Production, production, production... | ||
+ | #* Do we need an empty target run on Tuesday? | ||
+ | # Offline Analysis? | ||
+ | #* [https://logbooks.jlab.org/entry/3460485 Beam p measurements from MCC] | ||
+ | #* [https://logbooks.jlab.org/entry/3459758 Update on preliminary flux estimate] | ||
+ | #* [https://logbooks.jlab.org/entry/3460002 Reconstructed particle parameters vs. run] | ||
+ | # Any Other Business? | ||
+ | |||
==Saturday, February 18== | ==Saturday, February 18== | ||
Line 18: | Line 142: | ||
#* In the last 24 hours: | #* In the last 24 hours: | ||
#** ABU 16.73 hrs (5.80 + 5.32 + 5.61), BANU 1.73 hrs (0.28 + 0.72 + 0.73) | #** ABU 16.73 hrs (5.80 + 5.32 + 5.61), BANU 1.73 hrs (0.28 + 0.72 + 0.73) | ||
− | #** Total triggers collected: | + | #** Total triggers collected: 1813 M |
#* Better settings for [https://logbooks.jlab.org/entry/3459291 JTV 7 Nitrogen supply valve] | #* Better settings for [https://logbooks.jlab.org/entry/3459291 JTV 7 Nitrogen supply valve] | ||
#* Oscillating target pressure? [https://logbooks.jlab.org/entry/3459592] | #* Oscillating target pressure? [https://logbooks.jlab.org/entry/3459592] | ||
− | #* Progress on fixing | + | #* Progress on fixing random 32ns shift of TDC times [https://logbooks.jlab.org/entry/3459116] |
#* Software issues: | #* Software issues: | ||
#** Trouble starting Event Viewer [https://logbooks.jlab.org/entry/3459155] | #** Trouble starting Event Viewer [https://logbooks.jlab.org/entry/3459155] | ||
#** CSS was unavailable for about 1 hour (network problem?) [https://logbooks.jlab.org/entry/3459165] [https://logbooks.jlab.org/entry/3459179] | #** CSS was unavailable for about 1 hour (network problem?) [https://logbooks.jlab.org/entry/3459165] [https://logbooks.jlab.org/entry/3459179] | ||
#** RootSpy twice went down in an unusual mode: | #** RootSpy twice went down in an unusual mode: | ||
− | #** first, for 40 minutes at 11 AM [https://logbooks.jlab.org/entry/3459186] | + | #*** first, for 40 minutes at 11 AM [https://logbooks.jlab.org/entry/3459186] |
− | #** and from about 1 AM to 6 AM due to stalled | + | #*** and from about 1 AM to 6 AM due to stalled gluon118 |
− | #** plus a few restarts in accordance with standard prescriptions | + | #*** plus a few restarts in accordance with standard prescriptions |
+ | #*** In 3 runs in a row, reconstruction efficiency was 20%, 30%, 50% of the template [https://logbooks.jlab.org/entry/3459308] | ||
#** 3 latest shift summary reports mention DAQ reboots only 2 times! Unbelievable!!! | #** 3 latest shift summary reports mention DAQ reboots only 2 times! Unbelievable!!! | ||
# Monitoring | # Monitoring | ||
+ | #* [https://logbooks.jlab.org/entry/3459668 low level monitoring report] | ||
# Run Plan | # Run Plan | ||
#* Production, production, production... | #* Production, production, production... |
Latest revision as of 09:43, 22 February 2017
<- Back to Run Coordination Meetings: Spring 2017 Run
Contents
Wednesday, February 22
- Accelerator Status over the last 24 hrs
- We got beam back at 5pm after beam studies
- Hall D switched from zero crossing to RF extracted [1] [2]
- No downtime incidents of more than 30 minutes after 8 hrs of beam studies
- Harp scans: 5C11(MCC), 5C11B(MCC), Radiator
- (Sigma_X,Sigma_Y) for this scan: (1.10, 0.39), (0.87, 0.20), (0.76, 0.12)
- Previous scan from Feb 18: (0.88, 0.37), (0.71, 0.28), and (0.60, 0.18).
- Beam becomes wider in X and narrower in Y
- Analysis of the latest scan by Hovanes
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 12.37 hrs (1.5 + 4.53 + 6.34), BANU 1.53 hrs (0.17 + 0.82 + 0.54)
- Total triggers collected: 1084 M
- Alex B. did TAGM dark rates study
- 1 hour (33M) empty target run, and 0.5hrs of run with target being filled
- In the last 24 hours:
- Issues
- Monitoring
- Run Plan
- Production
- Trigger studies?
- Hall A bleadthrough measurement
- Offline Analysis?
- Any Other Business?
Tuesday, February 21
- Accelerator Status over the last 24 hrs
- Beam was stable when available, with some X variations at AD00C [5]
- Beam studies today from 9 AM to 5 PM
- No Hall access during beam studies
- Our target will be emptied
- Harp scan on Saturday:
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 15.25 hrs (5.69 + 6.08 + 3.48), BANU 2.91 hrs (1.55 + 0.90 + 0.46)
- Total triggers collected: 1650 M
- Solenoid Nitrogen liquid level alarm
- Upper bubbler is nearing its low level
- Prolonged FDC voltage alarm
- 2 additional parasitic TRD runs.
- In the last 24 hours:
- Issues
- Program crashes/restarts: DAQ - 4 (3 + 1 + 0); RootSpy - 1 (0 + 0 + 1)
- Monitoring
- Reinstalled PS reference plot [8]
- Do we need different reference plots for amorphous runs? [9] [10]
- Low level monitoring report
- Run Plan
- Production until beam studies start
- Start emptying the target
- Harp scans upon return of the beam
- Empty target run (1 hour)
- A special run with target being filled
- And back to production...
- Run Plan
- Offline Analysis?
- Any Other Business?
Monday, February 20
- Accelerator Status over the last 48 hrs
- Beam was mostly stable but with some increase in trip frequency [11] [12]
- Apparently, to turn on/off Hall A beam, our beam has to be taken down as well for a few minutes
- 2 downtime incidents of more than 30 minutes on Saturday:
- No significant accelerator downtime on Sunday
- Beam studies tomorrow: either 9:00-14:00, or 14:00-17:00
- Harp scan on Saturday:
- Beam was mostly stable but with some increase in trip frequency [11] [12]
- Hall-D/GlueX items
- In the last 48 hours:
- Feb 18: ABU 14.60 hrs (2.74 + 6.11 + 5.76), BANU 3.24 hrs (2.05 + 0.74 + 0.45)
- Feb 19: ABU 18.22 hrs (5.92 + 6.06 + 6.24), BANU 2.42 hrs (0.70 + 0.83 + 0.89)
- Feb 18: Total triggers collected: 1648 M
- Feb 19: Total triggers collected: 1720 M
- 2 parasitic TRD runs have been taken with different radiators.
- Trigger studies were performed by Sascha both on Saturday and Sunday
- In the last 48 hours:
- Issues
- Once, the goniometer got stuck moving, and Hovanes had to fix it [15]
- May be, related to the above - "unknown" diamond orientation [16]
- Puzzling CSS problem with TOF FADC scalers: [17]
- RootSpy issues:
- DAQ issues:
- Zero counting rate for some ROCs [23] while occupancy plots are normal
- Sergey did ~30 min of DAQ testing during on Saturday
- Monitoring
- New PSC reference plot [24] [25]
- New FDC reference plot [26]
- New holes in FCAL occupancy [27]
- Low level monitoring report (Feb 19)
- Low level monitoring report (Feb 20)
- Run Plan
- Production, production, production...
- Do we need an empty target run on Tuesday?
- Offline Analysis?
- Any Other Business?
Saturday, February 18
- Accelerator Status
- Beam was mostly stable in the last 24 hrs [28]
- BPM calibration
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 16.73 hrs (5.80 + 5.32 + 5.61), BANU 1.73 hrs (0.28 + 0.72 + 0.73)
- Total triggers collected: 1813 M
- Better settings for JTV 7 Nitrogen supply valve
- Oscillating target pressure? [34]
- Progress on fixing random 32ns shift of TDC times [35]
- Software issues:
- In the last 24 hours:
- Monitoring
- Run Plan
- Production, production, production...
- Harp scan
- Sascha's trigger studies?
- Offline Analysis?
- Beam energy so far
very stable around 11.650 GeV - Preliminary flux estimate
From 1.0*107 to 1.2*107 for different diamond orientations at 100nA
- Beam energy so far
- Any Other Business?
Friday, February 17
- Accelerator Status
- Hall was in controlled access from 7:00 till 16:30 for RF separator studies
- Work on TRD GEM by Kondo during this time
- Alexandre has retrieved supplemental dosimetry from the tagger
- Production restarted at 17:30
- Stable beam since then (max 10 minutes off on 2 occasions) [41]
- Radiation levels are about the same as earlier [42]
- Harp scans: MCC and ours.
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- (0.83, 0.32), (0.63, 0.24), (0.68, ??? - the fit has failed)
- Beam is ~20% tighter in X and twice narrower in Y comparing with a day ago
- Photon transmission is about the same as a day ago
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- BPM calibration?
- AD00 BPM is no longer the same as AD00C BCM but only 40% of it [43]
- Hall was in controlled access from 7:00 till 16:30 for RF separator studies
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 10.32 hrs (0 + 4.54 + 5.78), BANU 2.13 hrs (0 + 1.17 + 0.96)
- Total triggers collected: 1046 M
- The usual DAQ and RootSpy issues make shifts entertaining
- In the last 24 hours:
- Monitoring
- 32ns TDC-ADC offsets:
- Low Level Monitoring Report (today)
- Low Level Monitoring Report (Feb 16)
- Run Plan
- Production, production, production...
- Sascha's trigger studies?
- Offline Analysis?
- Any Other Business?
Thursday, February 16
- Accelerator Status
- Stable accelerator running over the last 24 hours
- Harp scans:
- MCC scans before and after Todd's script
"Good enough -- horizontal convergence is nearly spot on, and vertical convergence is a little shallow but ok." - Our scan: before and after Todd's script
- In terms of (Sigma_X, Sigma_Y) at 5C11, 5C11B and radiator:
- Before: (1.31, 0.63), (1.08, 0.73), (1.03, 0.41)
- After : (1.07, 0.51), (0.79, 0.50), (0.78, 0.32)
- MCC scans before and after Todd's script
- Convergence studies from Hovanes: Feb 15 vs Feb 9
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
"... uncertainties ... a lot larger compared to Feb 9. It is hard to make any conclusions about the improvement of the spot."
- Beam sigma at the radiator: 0.6cm (Feb 15) vs 0.5cm (Feb 9)
- Work on RF separation will start at 7:30 AM today and last for 2-3 hours
- Hall-D/GlueX items
- In the last 24 hours:
- ABU 17.66 hrs (4.97 + 6.37 + 6.32), BANU 2.21 hrs (1.27 + 0.40 + 0.54)
- Total triggers collected: 1856 M
- A usual assortment of DAQ crashes
- RootSpy tips:
- Restarting cMsg server
- Multiple instances of RootSpy on gluon47
"... no more than 1 or 2 instances running in the counting house at any point in time."
- New BCAL gain constants in ccdb [46]
- In the last 24 hours:
- Monitoring
- A new instance of 32ns ADC-TDC offset: [47]
- Run Plan
- 7:00 AM - 7:30 AM ==> Hall safety walk-through (After RADCON does it job)
- 7:30 AM - about 10 AM ==> MCC works on RF separation
- A new harp scan after RF separation work is done
- Production data
- Offline Analysis?
- Any Other Business?