Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"
From GlueXWiki
(→Friday, February 23) |
(→Tuesday, February 27) |
||
(90 intermediate revisions by the same user not shown) | |||
Line 32: | Line 32: | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* Production data | + | #* Production data |
#* Beam taken away 11:15-14:14 for linac issues | #* Beam taken away 11:15-14:14 for linac issues | ||
− | #* | + | #* [https://logbooks.jlab.org/entry/3536790 Owl Shift Summary]: rho, omega, phi triggers |
# Issues: | # Issues: | ||
#* ADC in slot 16 of the TOF crate is still commented out in the config file | #* ADC in slot 16 of the TOF crate is still commented out in the config file | ||
#* [https://logbooks.jlab.org/entry/3536533 FDC TDC-ADC timing shifts] | #* [https://logbooks.jlab.org/entry/3536533 FDC TDC-ADC timing shifts] | ||
− | #* Are these issues?: [https://logbooks.jlab.org/entry/3536053 Problem starting run], [https://logbooks.jlab.org/book/halld ROCSTPSC2 and ROCTAGM2 have no events], [https://logbooks.jlab.org/entry/3536339 Power cycle the ROCTRIG2 and Start the DAQ again] | + | #* Are these issues?: [https://logbooks.jlab.org/entry/3536053 Problem starting run], [https://logbooks.jlab.org/book/halld ROCSTPSC2 and ROCTAGM2 have no events], [https://logbooks.jlab.org/entry/3536339 Power cycle the ROCTRIG2 and Start the DAQ again], [https://logbooks.jlab.org/entry/3536790 ROCFCAL3] |
# Reports (?): | # Reports (?): | ||
#* [https://logbooks.jlab.org/entry/3536349 position variations at top of Hall D ramp] | #* [https://logbooks.jlab.org/entry/3536349 position variations at top of Hall D ramp] | ||
#* [https://logbooks.jlab.org/entry/3536386 Beamline HarpScan] | #* [https://logbooks.jlab.org/entry/3536386 Beamline HarpScan] | ||
+ | #* [https://logbooks.jlab.org/entry/3536996 Beam energy and transmission monitoring] | ||
+ | #* [https://logbooks.jlab.org/entry/3536973 Low level monitoring report] | ||
#* [https://logbooks.jlab.org/entry/3535706 Multi-scale active collimator calibration] any followup? | #* [https://logbooks.jlab.org/entry/3535706 Multi-scale active collimator calibration] any followup? | ||
# Planning: | # Planning: | ||
#* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week7.jpg 100nA 10-4 radiator] | #* [https://halldweb.jlab.org/wiki/index.php/File:Spring18_week7.jpg 100nA 10-4 radiator] | ||
− | #* [https://halldweb.jlab.org/DocDB/0035/003538/001/stevens_systematics.pdf Rate dependence, Flux, Polarization] | + | #* nA BPM commissioning: [https://halldweb.jlab.org/DocDB/0035/003538/001/stevens_systematics.pdf Rate dependence, Flux, Polarization] |
+ | #* [https://logbooks.jlab.org/entry/3536915 Current timings], [https://logbooks.jlab.org/entry/3536858 CDC and FDC timings] | ||
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
#* Harp scan at 7am | #* Harp scan at 7am | ||
#* Production data | #* Production data | ||
− | |||
== Saturday, February 24 == | == Saturday, February 24 == | ||
− | + | * No Hall D Counting Room meeting due to Collaboration Meeting | |
− | + | ||
== Sunday, February 25 == | == Sunday, February 25 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | + | #* Production data | |
+ | #* [https://logbooks.jlab.org/entry/3537708 Scan result for HALO] | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3537873 Missing channels on Tagger Miscrope]? | ||
+ | #* [https://logbooks.jlab.org/entry/3537996 FDC Occupancy plots] | ||
+ | #* [https://logbooks.jlab.org/entry/3538196 Low level monitoring] | ||
+ | #* FCAL pedestals check - re pi0 peak small shift (Matt's question) | ||
+ | #* ADC in slot 16 of the TOF crate is commented out in the config file | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3537316 Hall D Cavity BPMs] initial steps underway, more work on Monday | ||
+ | #* [https://logbooks.jlab.org/entry/3537357 Energy oscillations] | ||
+ | #* [https://logbooks.jlab.org/entry/3537161 Beam position update] | ||
+ | #* [https://logbooks.jlab.org/entry/3537938 AC x-response] | ||
+ | # Planning: | ||
+ | #* Move collimator+beam | ||
+ | #* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | ||
+ | #* [https://logbooks.jlab.org/entry/3537405 CDC 160 ns shift]: bring window even closer, narrow its width? Revert to CDC integral mode. | ||
+ | #* MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel. | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Harp scan in early morning: [https://logbooks.jlab.org/entry/3538262 does not look good] | ||
+ | #* Production data | ||
+ | #* Harp (around noon) | ||
+ | #* Special CDC run on diamond at 100nA for 30 min (Naomi will analyze) | ||
+ | #* Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes) | ||
+ | #* Move collimator (Hovanes) | ||
+ | #* PS scalers check (Sasha) | ||
+ | #* Change CDC to integral mode and keep for rest of run (Sasha) | ||
== Monday, February 26 == | == Monday, February 26 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | + | #* Production data | |
+ | #* [https://logbooks.jlab.org/entry/3538262 Scan result for HALO] | ||
+ | #* [https://logbooks.jlab.org/entry/3538424 New CDC settings] | ||
+ | # Issues: | ||
+ | #* Active Collimator [https://logbooks.jlab.org/entry/3538392 Repair attempt], [https://logbooks.jlab.org/entry/3538402 Beam profiler], [https://logbooks.jlab.org/entry/3538426 Transmission Scan] | ||
+ | #* FCAL pedestals check - re pi0 peak small shift (Matt's question) | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3538314 Collimator position change] | ||
+ | # Planning: | ||
+ | #* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | ||
+ | #* TAC plans | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Harp scan in early morning: [https://logbooks.jlab.org/entry/3538262 yesterday's scan] | ||
+ | #* Production data (until 1pm) | ||
+ | #* During Optics studies (1-3pm) | ||
+ | #**Elton walk through in Hall D and Tagger Hall. | ||
+ | #** MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel. | ||
+ | #** FCAL bases | ||
+ | #* Production data | ||
== Tuesday, February 27 == | == Tuesday, February 27 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
+ | #* Production data | ||
+ | #* [https://logbooks.jlab.org/entry/3538807 Scan result for HALO] | ||
+ | #* Controlled Access | ||
+ | #**[https://logbooks.jlab.org/entry/3538920 Active Collimator adapter replacements] | ||
+ | #** [https://logbooks.jlab.org/entry/3538916 Muon Chamber steel addition] and FCAL IOCs turned off | ||
+ | #** FCAL base work | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3539404 Magnet dump] | ||
+ | #* Trouble starting DAQ: rocps1 and rocps2 configuration files | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3539134 Hall D Cavity BPMs] | ||
+ | #*[https://logbooks.jlab.org/entry/3539550 Flux normalized yields from current scan] | ||
+ | #* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields | ||
+ | #* [https://logbooks.jlab.org/entry/3537030 Follow-up Re: CDC/FDC timings in 2016 and now] | ||
+ | # Longer Term Planning: | ||
+ | #* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment. | ||
+ | #* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | ||
+ | #* TAC plans | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* During magnet ramp up: AC, diamond alignment,... | ||
+ | #* Controlled Access during Tuesday's RF recovery? | ||
+ | #* Harp scan after beam comes back? | ||
+ | #* Production data | ||
− | + | == Wednesday, February 28 == | |
− | == | + | |
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
+ | #* Production data | ||
+ | #* [https://logbooks.jlab.org/entry/3538807 Scan result for HALO] | ||
+ | #* Controlled Access | ||
+ | #** Muon chamber removed | ||
+ | #** FCAL base work | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3539507 Low level monitoring] | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3539134 Hall D Cavity BPMs] | ||
+ | #* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields | ||
+ | # Longer Term Planning: | ||
+ | #* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment. | ||
+ | #* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | ||
+ | #* TAC plans | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Production data |
Latest revision as of 10:43, 27 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, February 22
- Notes from the previous 24 hours:
- Continued production data until 1:30pm
- Secretary Perry toured Hall D
- Beam delivery shaky: Swing shift summary
- DAQ/cMesg/rootSPY issues
- Dipole trip
- Transmission looks ok
- Production data
- Issues:
- Harp scan EPICS screenshot
- FDC trips: issue on 1 channel; Beni lowered the bias.
- Large Y-oscillations in 511C
- Photon beam intensity anomaly
- Reports (?):
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan once beam returns
- Production data
Friday, February 23
- Notes from the previous 24 hours:
- Production data
- Beam taken away 11:15-14:14 for linac issues
- Owl Shift Summary: rho, omega, phi triggers
- Issues:
- ADC in slot 16 of the TOF crate is still commented out in the config file
- FDC TDC-ADC timing shifts
- Are these issues?: Problem starting run, ROCSTPSC2 and ROCTAGM2 have no events, Power cycle the ROCTRIG2 and Start the DAQ again, ROCFCAL3
- Reports (?):
- Planning:
- 100nA 10-4 radiator
- nA BPM commissioning: Rate dependence, Flux, Polarization
- Current timings, CDC and FDC timings
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan at 7am
- Production data
Saturday, February 24
- No Hall D Counting Room meeting due to Collaboration Meeting
Sunday, February 25
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Issues:
- Missing channels on Tagger Miscrope?
- FDC Occupancy plots
- Low level monitoring
- FCAL pedestals check - re pi0 peak small shift (Matt's question)
- ADC in slot 16 of the TOF crate is commented out in the config file
- Reports:
- Hall D Cavity BPMs initial steps underway, more work on Monday
- Energy oscillations
- Beam position update
- AC x-response
- Planning:
- Move collimator+beam
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
- MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning: does not look good
- Production data
- Harp (around noon)
- Special CDC run on diamond at 100nA for 30 min (Naomi will analyze)
- Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes)
- Move collimator (Hovanes)
- PS scalers check (Sasha)
- Change CDC to integral mode and keep for rest of run (Sasha)
Monday, February 26
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- New CDC settings
- Issues:
- Active Collimator Repair attempt, Beam profiler, Transmission Scan
- FCAL pedestals check - re pi0 peak small shift (Matt's question)
- Reports:
- Planning:
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- TAC plans
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning: yesterday's scan
- Production data (until 1pm)
- During Optics studies (1-3pm)
- Elton walk through in Hall D and Tagger Hall.
- MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
- FCAL bases
- Production data
Tuesday, February 27
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Controlled Access
- Active Collimator adapter replacements
- Muon Chamber steel addition and FCAL IOCs turned off
- FCAL base work
- Issues:
- Magnet dump
- Trouble starting DAQ: rocps1 and rocps2 configuration files
- Reports:
- Hall D Cavity BPMs
- Flux normalized yields from current scan
- Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
- Follow-up Re: CDC/FDC timings in 2016 and now
- Longer Term Planning:
- FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- TAC plans
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- During magnet ramp up: AC, diamond alignment,...
- Controlled Access during Tuesday's RF recovery?
- Harp scan after beam comes back?
- Production data
Wednesday, February 28
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Controlled Access
- Muon chamber removed
- FCAL base work
- Issues:
- Reports:
- Hall D Cavity BPMs
- Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
- Longer Term Planning:
- FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- TAC plans
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Production data