Difference between revisions of "Run Planning Meeting Notes, Feb 12-Feb 28, 2018"
From GlueXWiki
(→Tuesday, February 27) |
(→Tuesday, February 27) |
||
(13 intermediate revisions by the same user not shown) | |||
Line 119: | Line 119: | ||
#**[https://logbooks.jlab.org/entry/3538920 Active Collimator adapter replacements] | #**[https://logbooks.jlab.org/entry/3538920 Active Collimator adapter replacements] | ||
#** [https://logbooks.jlab.org/entry/3538916 Muon Chamber steel addition] and FCAL IOCs turned off | #** [https://logbooks.jlab.org/entry/3538916 Muon Chamber steel addition] and FCAL IOCs turned off | ||
− | #** FCAL | + | #** FCAL base work |
# Issues: | # Issues: | ||
− | #* | + | #* [https://logbooks.jlab.org/entry/3539404 Magnet dump] |
+ | #* Trouble starting DAQ: rocps1 and rocps2 configuration files | ||
# Reports: | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3539134 Hall D Cavity BPMs] | ||
+ | #*[https://logbooks.jlab.org/entry/3539550 Flux normalized yields from current scan] | ||
#* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields | #* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields | ||
#* [https://logbooks.jlab.org/entry/3537030 Follow-up Re: CDC/FDC timings in 2016 and now] | #* [https://logbooks.jlab.org/entry/3537030 Follow-up Re: CDC/FDC timings in 2016 and now] | ||
− | # Planning: | + | # Longer Term Planning: |
+ | #* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment. | ||
#* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | #* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | ||
#* TAC plans | #* TAC plans | ||
# Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
− | #* | + | #* During magnet ramp up: AC, diamond alignment,... |
+ | #* Controlled Access during Tuesday's RF recovery? | ||
+ | #* Harp scan after beam comes back? | ||
#* Production data | #* Production data | ||
− | |||
== Wednesday, February 28 == | == Wednesday, February 28 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
+ | #* Production data | ||
+ | #* [https://logbooks.jlab.org/entry/3538807 Scan result for HALO] | ||
+ | #* Controlled Access | ||
+ | #** Muon chamber removed | ||
+ | #** FCAL base work | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3539507 Low level monitoring] | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3539134 Hall D Cavity BPMs] | ||
+ | #* Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields | ||
+ | # Longer Term Planning: | ||
+ | #* FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment. | ||
+ | #* 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup | ||
+ | #* TAC plans | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Run Plan Google Calendar]: | ||
+ | #* Production data |
Latest revision as of 10:43, 27 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, February 22
- Notes from the previous 24 hours:
- Continued production data until 1:30pm
- Secretary Perry toured Hall D
- Beam delivery shaky: Swing shift summary
- DAQ/cMesg/rootSPY issues
- Dipole trip
- Transmission looks ok
- Production data
- Issues:
- Harp scan EPICS screenshot
- FDC trips: issue on 1 channel; Beni lowered the bias.
- Large Y-oscillations in 511C
- Photon beam intensity anomaly
- Reports (?):
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan once beam returns
- Production data
Friday, February 23
- Notes from the previous 24 hours:
- Production data
- Beam taken away 11:15-14:14 for linac issues
- Owl Shift Summary: rho, omega, phi triggers
- Issues:
- ADC in slot 16 of the TOF crate is still commented out in the config file
- FDC TDC-ADC timing shifts
- Are these issues?: Problem starting run, ROCSTPSC2 and ROCTAGM2 have no events, Power cycle the ROCTRIG2 and Start the DAQ again, ROCFCAL3
- Reports (?):
- Planning:
- 100nA 10-4 radiator
- nA BPM commissioning: Rate dependence, Flux, Polarization
- Current timings, CDC and FDC timings
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan at 7am
- Production data
Saturday, February 24
- No Hall D Counting Room meeting due to Collaboration Meeting
Sunday, February 25
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Issues:
- Missing channels on Tagger Miscrope?
- FDC Occupancy plots
- Low level monitoring
- FCAL pedestals check - re pi0 peak small shift (Matt's question)
- ADC in slot 16 of the TOF crate is commented out in the config file
- Reports:
- Hall D Cavity BPMs initial steps underway, more work on Monday
- Energy oscillations
- Beam position update
- AC x-response
- Planning:
- Move collimator+beam
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- CDC 160 ns shift: bring window even closer, narrow its width? Revert to CDC integral mode.
- MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning: does not look good
- Production data
- Harp (around noon)
- Special CDC run on diamond at 100nA for 30 min (Naomi will analyze)
- Put profiler in to check active collimator X; MCC cannot lock on to it but can lock on Y (Hovanes)
- Move collimator (Hovanes)
- PS scalers check (Sasha)
- Change CDC to integral mode and keep for rest of run (Sasha)
Monday, February 26
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- New CDC settings
- Issues:
- Active Collimator Repair attempt, Beam profiler, Transmission Scan
- FCAL pedestals check - re pi0 peak small shift (Matt's question)
- Reports:
- Planning:
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- TAC plans
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Harp scan in early morning: yesterday's scan
- Production data (until 1pm)
- During Optics studies (1-3pm)
- Elton walk through in Hall D and Tagger Hall.
- MWPC: check noise with FCAL monitoring system off; move steel plate upstream/add more steel.
- FCAL bases
- Production data
Tuesday, February 27
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Controlled Access
- Active Collimator adapter replacements
- Muon Chamber steel addition and FCAL IOCs turned off
- FCAL base work
- Issues:
- Magnet dump
- Trouble starting DAQ: rocps1 and rocps2 configuration files
- Reports:
- Hall D Cavity BPMs
- Flux normalized yields from current scan
- Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
- Follow-up Re: CDC/FDC timings in 2016 and now
- Longer Term Planning:
- FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- TAC plans
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- During magnet ramp up: AC, diamond alignment,...
- Controlled Access during Tuesday's RF recovery?
- Harp scan after beam comes back?
- Production data
Wednesday, February 28
- Notes from the previous 24 hours:
- Production data
- Scan result for HALO
- Controlled Access
- Muon chamber removed
- FCAL base work
- Issues:
- Reports:
- Hall D Cavity BPMs
- Processing CDC runs 41482, 41483, 41502 and 41507 to study the flux normalized yields
- Longer Term Planning:
- FCAL reset baselines; Sean fADC250 firmware update. BCAL adjustment.
- 750um converter run (on diamond), PS trigger prescale factor to match current livetime; check pileup
- TAC plans
- Today's run plan Run Plan Google Calendar Accel. Run Plan Google Calendar:
- Production data