Difference between revisions of "Run Planning Meeting Notes, Apr5-Apr 11, 2018"
From GlueXWiki
(→Thursday, April 5 at 08:45) |
|||
(12 intermediate revisions by 3 users not shown) | |||
Line 23: | Line 23: | ||
#* TAC run using V-wire today (pending good AC lock) | #* TAC run using V-wire today (pending good AC lock) | ||
#* Production Running | #* Production Running | ||
+ | |||
# AOB | # AOB | ||
Line 29: | Line 30: | ||
#* Some issues getting stable beam through the day except for ~1hr over lunch | #* Some issues getting stable beam through the day except for ~1hr over lunch | ||
#* V-wire setup late afternoon | #* V-wire setup late afternoon | ||
− | #* TAC/PS efficiency tests | + | #* TAC run postponed |
− | #* | + | #* TAC/PS efficiency tests |
− | #* | + | #* Empty target and raw mode run |
− | #* | + | #* Production running overnight |
+ | #* Running until May 6 official. | ||
+ | #* 3 month down time likely | ||
#Issues: | #Issues: | ||
− | #* | + | #* [https://logbooks.jlab.org/entry/3555570 Multiple peaks in profiler (AC lock?)] (Hovanes) |
− | + | #* [https://logbooks.jlab.org/entry/3555625 BCAL Occupancy] (Elton) | |
− | + | #* Hot channel in TAGH | |
− | #* [https://logbooks.jlab.org/entry/ | + | |
# Reports: | # Reports: | ||
− | #* [https://logbooks.jlab.org/entry/ | + | #* [https://logbooks.jlab.org/entry/3555314 Rates with the 75 um and 750 um Be converters] (Alexandre) |
− | #* [https://logbooks.jlab.org/entry/ | + | #* [https://logbooks.jlab.org/entry/3555496 Calibration Updates] (Sean) |
+ | #* [https://logbooks.jlab.org/entry/3555726 Low Level Monitoring Report] (Thomas) | ||
# Run Plan | # Run Plan | ||
− | #* | + | #* Beam down for 2-4 hours for Hall-B pass change |
+ | #* SSP (trigger studies) 1h (Sascha) | ||
+ | #* CODA 3.08 Test 1h (Sergey) | ||
+ | #* CDC Rate studies? (Lubomir) | ||
#* Production Running | #* Production Running | ||
− | |||
− | |||
# AOB | # AOB | ||
== Saturday, April 7 at 10:00 == | == Saturday, April 7 at 10:00 == | ||
''--- NO MEETING ---'' | ''--- NO MEETING ---'' | ||
+ | |||
== Sunday, April 8 at 10:00 == | == Sunday, April 8 at 10:00 == | ||
+ | ''--- NO MEETING ---'' | ||
+ | |||
== Monday, April 9 at 08:45 == | == Monday, April 9 at 08:45 == | ||
+ | # Notes from the previous 72 hours: | ||
+ | #* Mostly stable beam over weekend | ||
+ | #* CDC Intensity scan completed Friday | ||
+ | #* Hot FCAL channel causing higher trigger rate Saturday lost ~5hr | ||
+ | #* Sensor failure in tagger dump on Sunday lost ~6.5hr | ||
+ | #* Some issues getting stable beam through the day except for ~1hr over lunch | ||
+ | #Issues: | ||
+ | #* Eugene and Elton are out of town. Beni is Hall leader | ||
+ | #* [https://logbooks.jlab.org/entry/3556085 Pb Plate increases FDC current] | ||
+ | #* [https://logbooks.jlab.org/entry/3556615 Hot FCAL channel causes increased trigger rate] | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3557293 Low Level Monitoring Report] (Thomas) | ||
+ | #* [https://logbooks.jlab.org/entry/3556052 Empty Target] (Simon) | ||
+ | #* [https://logbooks.jlab.org/entry/3556131 BCAL background]([https://logbooks.jlab.org/entry/3555910 hdview2])(Mark D.) | ||
+ | #* [https://logbooks.jlab.org/entry/3556409 Transmission] and [https://logbooks.jlab.org/entry/3556424 Beam Energy](Alexandre) | ||
+ | #* [https://logbooks.jlab.org/entry/3556975 Beam Convergence](Hovanes) | ||
+ | #* [https://logbooks.jlab.org/entry/3557324 CDC Background] (Sergey) | ||
+ | #* [https://docs.google.com/presentation/d/1cCeHChwz_VCfb73A23QacOxT-Hrnfhke0LQaCKlMNW0/edit?usp=sharing Synchotron Radiation in Gluex] (Richard) | ||
+ | # Run Plan | ||
+ | #* Beam down 8hrs of Beam Studies | ||
+ | #** Install plates for shield scan | ||
+ | #* Fast raster beam characterization (4hr) | ||
+ | #* Pre-AC shield scan (?) | ||
+ | #* Production Running | ||
+ | # AOB | ||
+ | |||
== Tuesday, April 10 at 08:45 == | == Tuesday, April 10 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* [https://logbooks.jlab.org/entry/3557401 Additional Shielding installed] | ||
+ | #* [https://logbooks.jlab.org/entry/3557507 Abosrber Plates Installed] | ||
+ | #* [https://logbooks.jlab.org/entry/3557645 Beam convergence re-tuned] | ||
+ | #* Beam returned to us ~20:00. Mostly steady beam w/ production running overnight. | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3557431 W effect on AC] (Lubomir) | ||
+ | #* [https://logbooks.jlab.org/entry/3557510 Glitches in Beam Energy Monitoring] (Alexandre) | ||
+ | #* [https://logbooks.jlab.org/entry/3557699 CDC Noisy pre-amp] (Naomi) | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3557853 Low Level Monitoring Report] (Thomas) | ||
+ | #* [https://logbooks.jlab.org/entry/3557458 BCAL point distributions] (Mark D.) | ||
+ | #* [https://logbooks.jlab.org/entry/3557680 Material Scan Results] (Lubomir) | ||
+ | #[https://halldweb.jlab.org/wiki/index.php/File:Spring18_week13.jpg Run Plan] | ||
+ | #* Beam goes down for 4hrs of RF recovery at 9am | ||
+ | #* Access List: | ||
+ | #** Nick - CDC preamp replacement(?) | ||
+ | #** Sasha, Chris - Tagger Hall ? | ||
+ | #** Tim,Hovanes,? - Restore 1mm Pb plate | ||
+ | #* TAC run | ||
+ | #* [[Beam halo measurements to assess background for PRad target TAC runs.|PRad background test]] | ||
+ | #* Production Running | ||
+ | #* Trigger Studies (2hr) moved to Wed. | ||
+ | #* Fast raster study (4hr) moved to Friday | ||
+ | # AOB | ||
+ | |||
== Wednesday, April 11 at 08:45 == | == Wednesday, April 11 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Down for RF recovery most of day | ||
+ | #* [https://logbooks.jlab.org/entry/3558003 1mm Pb plate restored on profiler (other plates removed)] (Mark S.) | ||
+ | #* [https://logbooks.jlab.org/entry/3557988 Hot CDC preamp card replaced] (Nick) | ||
+ | #* [https://logbooks.jlab.org/entry/3558212 New CDC and FDC baseline calibrations] (Beni) | ||
+ | #* Beam returned ~16:00 | ||
+ | #* Radiator Thickness Studies ~6.5hr (spotty beam) | ||
+ | #* Production Running overnight | ||
+ | # Issues: | ||
+ | #* Beam Convergence | ||
+ | #** [https://logbooks.jlab.org/entry/3557934 Before RF recovery] | ||
+ | #** [https://logbooks.jlab.org/entry/3558362 After RF recovery] | ||
+ | #* [https://logbooks.jlab.org/entry/3558508 PS Coincidence Rate] | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3558636 Low Level Monitoring Report] | ||
+ | #* [https://logbooks.jlab.org/entry/3558551 Automated Online Calibrations] | ||
+ | #* Beamline | ||
+ | #** [https://logbooks.jlab.org/entry/3558232 Collimation Functions] (Richard) | ||
+ | #** [https://logbooks.jlab.org/entry/3558299 LPM Effect in Hall-D] (Richard) | ||
+ | #** [https://logbooks.jlab.org/entry/3558669 Brem. Spectral Intensity] (Richard) | ||
+ | #** [https://logbooks.jlab.org/entry/3558682 Rates/currents w/o Profiler, Al, Cu] | ||
+ | #[https://halldweb.jlab.org/wiki/index.php/File:Spring18_week13.jpg Run Plan] | ||
+ | #* TAC Run deferred until Friday morning | ||
+ | #* Possibly hour of beam down ~13:00 or 13:30 | ||
+ | #* Production Running | ||
+ | # AOB | ||
+ | #* New Run Coordinator: Colin Gleason |
Latest revision as of 17:19, 11 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 5 at 08:45
- Notes from the previous 24 hours:
- Beam convergence adjustment by Todd
- Beam issues off and on through Swing and Owl shifts
- fADC125 module failure in FDC. Rapid access used by Sascha and Cody to replace.
- Other DAQ issues ~1hr for swing + owl
- Issues:
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- TAGH had few tripped channels with no alarm sounding
- High Level monitoring plots look bad (calibrations)
- Bubblers
- Shift-takers should at least log any acknowledged alarms so that they are not forgotten
- Reports:
- Run Plan
- TAC run using V-wire today (pending good AC lock)
- Production Running
- AOB
Friday, April 6 at 08:45
- Notes from the previous 24 hours:
- Some issues getting stable beam through the day except for ~1hr over lunch
- V-wire setup late afternoon
- TAC run postponed
- TAC/PS efficiency tests
- Empty target and raw mode run
- Production running overnight
- Running until May 6 official.
- 3 month down time likely
- Issues:
- Multiple peaks in profiler (AC lock?) (Hovanes)
- BCAL Occupancy (Elton)
- Hot channel in TAGH
- Reports:
- Rates with the 75 um and 750 um Be converters (Alexandre)
- Calibration Updates (Sean)
- Low Level Monitoring Report (Thomas)
- Run Plan
- Beam down for 2-4 hours for Hall-B pass change
- SSP (trigger studies) 1h (Sascha)
- CODA 3.08 Test 1h (Sergey)
- CDC Rate studies? (Lubomir)
- Production Running
- AOB
Saturday, April 7 at 10:00
--- NO MEETING ---
Sunday, April 8 at 10:00
--- NO MEETING ---
Monday, April 9 at 08:45
- Notes from the previous 72 hours:
- Mostly stable beam over weekend
- CDC Intensity scan completed Friday
- Hot FCAL channel causing higher trigger rate Saturday lost ~5hr
- Sensor failure in tagger dump on Sunday lost ~6.5hr
- Some issues getting stable beam through the day except for ~1hr over lunch
- Issues:
- Eugene and Elton are out of town. Beni is Hall leader
- Pb Plate increases FDC current
- Hot FCAL channel causes increased trigger rate
- Reports:
- Low Level Monitoring Report (Thomas)
- Empty Target (Simon)
- BCAL background(hdview2)(Mark D.)
- Transmission and Beam Energy(Alexandre)
- Beam Convergence(Hovanes)
- CDC Background (Sergey)
- Synchotron Radiation in Gluex (Richard)
- Run Plan
- Beam down 8hrs of Beam Studies
- Install plates for shield scan
- Fast raster beam characterization (4hr)
- Pre-AC shield scan (?)
- Production Running
- Beam down 8hrs of Beam Studies
- AOB
Tuesday, April 10 at 08:45
- Notes from the previous 24 hours:
- Additional Shielding installed
- Abosrber Plates Installed
- Beam convergence re-tuned
- Beam returned to us ~20:00. Mostly steady beam w/ production running overnight.
- Issues:
- W effect on AC (Lubomir)
- Glitches in Beam Energy Monitoring (Alexandre)
- CDC Noisy pre-amp (Naomi)
- Reports:
- Low Level Monitoring Report (Thomas)
- BCAL point distributions (Mark D.)
- Material Scan Results (Lubomir)
- Run Plan
- Beam goes down for 4hrs of RF recovery at 9am
- Access List:
- Nick - CDC preamp replacement(?)
- Sasha, Chris - Tagger Hall ?
- Tim,Hovanes,? - Restore 1mm Pb plate
- TAC run
- PRad background test
- Production Running
- Trigger Studies (2hr) moved to Wed.
- Fast raster study (4hr) moved to Friday
- AOB
Wednesday, April 11 at 08:45
- Notes from the previous 24 hours:
- Down for RF recovery most of day
- 1mm Pb plate restored on profiler (other plates removed) (Mark S.)
- Hot CDC preamp card replaced (Nick)
- New CDC and FDC baseline calibrations (Beni)
- Beam returned ~16:00
- Radiator Thickness Studies ~6.5hr (spotty beam)
- Production Running overnight
- Issues:
- Beam Convergence
- PS Coincidence Rate
- Reports:
- Low Level Monitoring Report
- Automated Online Calibrations
- Beamline
- Collimation Functions (Richard)
- LPM Effect in Hall-D (Richard)
- Brem. Spectral Intensity (Richard)
- Rates/currents w/o Profiler, Al, Cu
- Run Plan
- TAC Run deferred until Friday morning
- Possibly hour of beam down ~13:00 or 13:30
- Production Running
- AOB
- New Run Coordinator: Colin Gleason