Difference between revisions of "May 31, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(6 intermediate revisions by 3 users not shown) | |||
Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-II_and_DIRC_ERR Experimental Readiness Review June 25] | ||
− | #* Pre-brief material online by June 15 | + | #** Pre-brief material online by June 15 |
− | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting] | + | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-June-2018 Collaboration meeting June 21-23] |
# Support structure update (Tim, Mark) | # Support structure update (Tim, Mark) | ||
− | #* Roll fixture and bar box installation | + | #* Roll fixture and dummy bar box installation |
#* Preparations for bar box delivery | #* Preparations for bar box delivery | ||
# [https://twitter.com/GlueX_DIRC Bar box transportation] | # [https://twitter.com/GlueX_DIRC Bar box transportation] | ||
Line 27: | Line 27: | ||
#*Status update (Ernie and Jason) | #*Status update (Ernie and Jason) | ||
#** Box production at Lesker (Ernie visit today) | #** Box production at Lesker (Ernie visit today) | ||
− | #** PMT test fixture and cookies (Maria) | + | #** PMT test fixture and cookies ([https://gluexdirc.mit.edu/red-bracket-tests Maria]) |
#** Window procurement | #** Window procurement | ||
#** Dark box conceptual design | #** Dark box conceptual design | ||
− | #** Magnetic field discussion | + | #** Magnetic field discussion: |
+ | #***[https://halldweb.jlab.org/wiki/images/0/0f/Dirc5.31.18.pdf H12700 studies for LHCb] and [https://arxiv.org/pdf/1506.04302.pdf full paper] | ||
# Simulation studies (Maria and Roman) | # Simulation studies (Maria and Roman) | ||
− | # MAPMT testing (Bill) | + | # [https://halldweb.jlab.org/DocDB/0035/003581/001/Dirc_May_31_2018.pdf MAPMT testing] (Bill) |
# AOB | # AOB |
Latest revision as of 09:56, 31 May 2018
Meeting Information
GlueX DIRC Meeting
Thursday May 31, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Experimental Readiness Review June 25
- Pre-brief material online by June 15
- Collaboration meeting June 21-23
- Experimental Readiness Review June 25
- Support structure update (Tim, Mark)
- Roll fixture and dummy bar box installation
- Preparations for bar box delivery
- Bar box transportation
- Optical box
- Status update (Ernie and Jason)
- Box production at Lesker (Ernie visit today)
- PMT test fixture and cookies (Maria)
- Window procurement
- Dark box conceptual design
- Magnetic field discussion:
- Status update (Ernie and Jason)
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- AOB