Difference between revisions of "January 7, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Monday January 7, 2019<br> 1:00 pm, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom room s...") |
(→Agenda) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
Monday January 7, 2019<br> | Monday January 7, 2019<br> | ||
1:00 pm, EDT<br> | 1:00 pm, EDT<br> | ||
− | JLab | + | JLab Hall D counting house <br> |
== Connection Using Bluejeans == | == Connection Using Bluejeans == | ||
Line 19: | Line 19: | ||
#* New meeting time for Spring semester: [https://doodle.com/poll/pg2ftbus32yfe67c Doodle poll] | #* New meeting time for Spring semester: [https://doodle.com/poll/pg2ftbus32yfe67c Doodle poll] | ||
# Installation status (All) | # Installation status (All) | ||
− | #** Upper bar boxes installed (Matt, Tim) | + | #* [https://logbooks.jlab.org/entry/3640873 Before holiday shutdown] (Tim) |
− | # | + | #* Upper bar boxes installed (Matt, Tim) |
− | #** Quartz window RTV'd for lower box and delivery to JLab Monday, upper box | + | #* Dark box enclosure light tightness and cooling tests (All) |
− | # | + | #** [https://logbooks.jlab.org/entry/3640620 Cooling test] |
+ | #** [https://logbooks.jlab.org/entry/3641311 Light tightness test] | ||
+ | #* Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box window to be installed next Monday (Ernie) | ||
+ | #* LED fiber feedthroughs installation (Bill, Kieth) | ||
# Software/simulations | # Software/simulations | ||
− | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie) | + | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) |
#* LED generator and timing calibration (Yunjie) | #* LED generator and timing calibration (Yunjie) | ||
#* Time-based studies and adding # photons to LUT likelihood (Maria) | #* Time-based studies and adding # photons to LUT likelihood (Maria) | ||
Line 30: | Line 33: | ||
#* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All) | #* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All) | ||
#** Many recent updates to '''dirc_commissioning_2018''' branches, expect to go on master later on Wednesday | #** Many recent updates to '''dirc_commissioning_2018''' branches, expect to go on master later on Wednesday | ||
+ | # [[Spring 2019 DIRC Commissioning]] (All) | ||
# [[Addressing ERR review recommendations]] | # [[Addressing ERR review recommendations]] | ||
# AOB | # AOB |
Latest revision as of 13:02, 7 January 2019
Meeting Information
GlueX DIRC Meeting
Monday January 7, 2019
1:00 pm, EDT
JLab Hall D counting house
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- New meeting time for Spring semester: Doodle poll
- Installation status (All)
- Before holiday shutdown (Tim)
- Upper bar boxes installed (Matt, Tim)
- Dark box enclosure light tightness and cooling tests (All)
- Quartz window RTV'd for lower box and delivery to JLab on Monday, upper box window to be installed next Monday (Ernie)
- LED fiber feedthroughs installation (Bill, Kieth)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- LED generator and timing calibration (Yunjie)
- Time-based studies and adding # photons to LUT likelihood (Maria)
- Alignment updates (Cris)
- Software overview and tasks (All)
- Many recent updates to dirc_commissioning_2018 branches, expect to go on master later on Wednesday
- Spring 2019 DIRC Commissioning (All)
- Addressing ERR review recommendations
- AOB