# Past 24 hours:
 
# Past 24 hours:
#* Nominal DIRC setting collected 1B triggers, switching to the higher MOROC threshold (200)
+
#* Nominal DIRC setting collected 1B triggers
 +
#** Switched to the higher MOROC threshold (200)
 
#* Smooth overnight running at 180nA, coming back to the desired 225nA this morning.
 
#* Smooth overnight running at 180nA, coming back to the desired 225nA this morning.
 
#* Both opportunistic accesses happened during the accelerator down time due to the bulk power supply failure.
 
#* Both opportunistic accesses happened during the accelerator down time due to the bulk power supply failure.
 
 
# Issues:
 
# Issues:
 
#* Beam steered to the wrong BCM, therefore constrained the maximum beam delivered to 180nA
 
#* Beam steered to the wrong BCM, therefore constrained the maximum beam delivered to 180nA
#* Goni camera, wrong angle, did something move?
+
#**Detailed log: https://logbooks.jlab.org/entry/3653554
#* root spy crash
+
#* Goni camera, wrong angle, did something move? https://logbooks.jlab.org/entry/3653437
#* DIRC SSP out of sync over night (after switching the MOROC threshold).  
+
#* root spy crash: https://logbooks.jlab.org/entry/3653678
 
+
#* DIRC SSP  
 +
#** Runs at MOROC threshold of 50 not possible due to the out of sync issue, need to be looked into
 +
#** Out of sync over night (after switching the MOROC threshold).  
 +
#* hdview2 and monitoring email working?
 
# Plan for today:
 
# Plan for today:
 
#* keep collecting higher MOROC threshold data (up to 1B triggers).
 
#* keep collecting higher MOROC threshold data (up to 1B triggers).
 
#* When beam is not available, 15 min LED runs with different pulsing and trigger conditions.
 
#* When beam is not available, 15 min LED runs with different pulsing and trigger conditions.
 +
#* No planned and opportunistic access

Latest revision as of 10:09, 15 February 2019

Thursday, Feb. 14 at 08:45

  1. Past 24 hours:
  2. Issues
  3. Today:
    • No planned access
    • Opportunistic access requested by Kenoe to work on GEM.
    • DIRC nominal running (MOROC threshold scan?)

Friday, Feb. 15 at 08:45

  1. Past 24 hours:
    • Nominal DIRC setting collected 1B triggers
      • Switched to the higher MOROC threshold (200)
    • Smooth overnight running at 180nA, coming back to the desired 225nA this morning.
    • Both opportunistic accesses happened during the accelerator down time due to the bulk power supply failure.
  2. Issues:
  3. Plan for today:
    • keep collecting higher MOROC threshold data (up to 1B triggers).
    • When beam is not available, 15 min LED runs with different pulsing and trigger conditions.
    • No planned and opportunistic access