Difference between revisions of "April 30, 2019 DIRC"
From GlueXWiki
(→Agenda) |
|||
(7 intermediate revisions by 3 users not shown) | |||
Line 20: | Line 20: | ||
# Summer installation planning: | # Summer installation planning: | ||
#* Window for upper box (Ernie) | #* Window for upper box (Ernie) | ||
− | #* Ongoing | + | #* Ongoing bar box light tightness work (Mark/Bill/All [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_meeting_Apr_30.pdf]) |
− | #* Cookies | + | #* Cookies (Yunjie/Maria) |
#* Plans for tests with LED fibers and canullas (Bill/Fernando) | #* Plans for tests with LED fibers and canullas (Bill/Fernando) | ||
+ | #* All DIRC equipment removed form EEL126 for renovation | ||
+ | # Documentation | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3974 Comprehensive writeup (Maria)] | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3983 Cookies (Maria)] | ||
# [[Spring 2019 DIRC Commissioning]] (All) | # [[Spring 2019 DIRC Commissioning]] (All) | ||
− | #* Half of REST data processed with updated dirc_tree plugin. Disk failure prematurely ended the processing this past weekend. | + | #* Half of REST data processed with updated dirc_tree plugin (ver08_pass04). Disk failure on JLab farm prematurely ended the processing this past weekend. |
− | #* | + | #** Files located at /volatile/halld/home/jrsteven/RunPeriod-2019-01/dirc_monitoring/analysis_REST/ver08_pass04/merged/ |
+ | #* Another pass will begin shortly to finish processing the full dataset | ||
+ | #* Reconstruction with FastDIRC ([https://halldweb.jlab.org/wiki/images/b/b1/FastDIRC_recon_043019.pdf Yunjie]) | ||
+ | #* [http://web-docs.gsi.de/~aali/dirc_1.pdf Commissioning analyses (Ahmed)] | ||
# Software/simulations | # Software/simulations | ||
#* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) | #* Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie) |
Latest revision as of 14:48, 30 April 2019
Meeting Information
GlueX DIRC Meeting
Tuesday April 30, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration Meeting May 14-16, 2019 at Jefferson Lab.
- Summer installation planning:
- Window for upper box (Ernie)
- Ongoing bar box light tightness work (Mark/Bill/All [2])
- Cookies (Yunjie/Maria)
- Plans for tests with LED fibers and canullas (Bill/Fernando)
- All DIRC equipment removed form EEL126 for renovation
- Documentation
- Spring 2019 DIRC Commissioning (All)
- Half of REST data processed with updated dirc_tree plugin (ver08_pass04). Disk failure on JLab farm prematurely ended the processing this past weekend.
- Files located at /volatile/halld/home/jrsteven/RunPeriod-2019-01/dirc_monitoring/analysis_REST/ver08_pass04/merged/
- Another pass will begin shortly to finish processing the full dataset
- Reconstruction with FastDIRC (Yunjie)
- Commissioning analyses (Ahmed)
- Half of REST data processed with updated dirc_tree plugin (ver08_pass04). Disk failure on JLab farm prematurely ended the processing this past weekend.
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB