Difference between revisions of "July 23, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(14 intermediate revisions by 5 users not shown) | |||
Line 19: | Line 19: | ||
# Installation work: | # Installation work: | ||
#* Mirror studies: | #* Mirror studies: | ||
− | #** [https:// | + | #** Mirrors in OB determined to be UV-enhanced first surface mirrors which are different from those used in test sample studies |
− | #** [https://logbooks.jlab.org/entry/ | + | #*** [https://halldweb.jlab.org/wiki/images/e/ed/Reflectivity.pdf Implications for reflectivity vs wavelength, long term tests under water, etc.] (Justin/All) |
+ | #** [https://logbooks.jlab.org/entry/3706827 Strongback disassembly and mirror reflectivity measurements] [https://halldweb.jlab.org/DocDB/0041/004127/001/DIRC_reflectivity_report.pdf Reflectivity Report] (Bill) | ||
+ | #** Tests of composition from oxidized surfaces (Eugene/[https://halldweb.jlab.org/DocDB/0035/003581/002/2019_July_23_DIRC_Meeting_chemical_composition_analysis.pdf Bill]) | ||
#* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All) | #* Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All) | ||
− | #** Results from UV enhanced mirror in water sample with DP190 | + | #** [https://logbooks.jlab.org/entry/3708280 Results from UV enhanced mirror in water sample with DP190] |
#* Next steps: | #* Next steps: | ||
− | #** Receive mirror from Bates and have cut for additional sample pieces (Wednesday 7/24) | + | #** Receive remaining UV enhanced mirror from Bates and have cut for additional sample pieces (Wednesday 7/24) |
− | #** Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation | + | #** Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation. After receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB |
− | + | #** Replace mirrors on Lower (South) mirror box, re-anodize strong back and reapply new mirrors. Need to choose the same UV-enhanced or other first surface mirrors from previous tests. | |
+ | #*** Tests of separating test mirrors from aluminum piece already underway | ||
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* Commissioning LUT analyses (All) | #* Commissioning LUT analyses (All) | ||
+ | #**[https://web-docs.gsi.de/~rdzhigad/www/research/cherenkov-ring-fit Cherenkov ring fit] (Roman) | ||
+ | #**[http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_cherenkov_DR_compare.html Cherenkov Systematics] [https://halldweb.jlab.org/wiki/images/a/aa/G_commitionning.pdf Survey Corrections] (Ahmed) | ||
+ | #* Commissioning FastDIRC update ([https://halldweb.jlab.org/wiki/images/7/7c/FastDIRC_update_072319.pdf Yunjie]) | ||
#* Contributions to Jerry's DIRC review article (Yunjie, All) | #* Contributions to Jerry's DIRC review article (Yunjie, All) | ||
# Software/simulations | # Software/simulations |
Latest revision as of 12:54, 23 July 2019
Meeting Information
GlueX DIRC Meeting
Tuesday July 23, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation work:
- Mirror studies:
- Mirrors in OB determined to be UV-enhanced first surface mirrors which are different from those used in test sample studies
- Strongback disassembly and mirror reflectivity measurements Reflectivity Report (Bill)
- Tests of composition from oxidized surfaces (Eugene/Bill)
- Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
- Next steps:
- Receive remaining UV enhanced mirror from Bates and have cut for additional sample pieces (Wednesday 7/24)
- Decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation. After receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
- Replace mirrors on Lower (South) mirror box, re-anodize strong back and reapply new mirrors. Need to choose the same UV-enhanced or other first surface mirrors from previous tests.
- Tests of separating test mirrors from aluminum piece already underway
- Mirror studies:
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Cherenkov Systematics Survey Corrections (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Contributions to Jerry's DIRC review article (Yunjie, All)
- Commissioning LUT analyses (All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB