Difference between revisions of "Controls Meeting 17-Oct-2019"
From GlueXWiki
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
* Announcements | * Announcements | ||
* Solenoid status (Tim,Beni,Brian) | * Solenoid status (Tim,Beni,Brian) | ||
− | ** Power up | + | ** Power up tests |
** PXI | ** PXI | ||
* Goniometer status | * Goniometer status | ||
* gluon cluster upgrades (Hovanes) | * gluon cluster upgrades (Hovanes) | ||
* Voltage controls changes (Hovanes) | * Voltage controls changes (Hovanes) | ||
− | *: [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]] | + | *: Noticed a problem : [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]] |
+ | *: Elton noticed [https://logbooks.jlab.org/entry/3734805 BCAL voltage issues] | ||
* ComCal installation/survey | * ComCal installation/survey | ||
* DIRC controls (Nick) | * DIRC controls (Nick) |
Latest revision as of 09:55, 17 October 2019
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Power up tests
- PXI
- Goniometer status
- gluon cluster upgrades (Hovanes)
- Voltage controls changes (Hovanes)
- Noticed a problem : CDC airflow interlock indicator green while CDC LV is interlocked
- Elton noticed BCAL voltage issues
- ComCal installation/survey
- DIRC controls (Nick)
- Other business
Time/Location
10:00AM Thursday 17-Oct-2019 CC B101