− | HV SCAN OF TOF PMTS | + | == HV SCAN OF TOF PMTS == |
* Beam conditions: 180nA e-beam on 3.10^4 Al radiator | * Beam conditions: 180nA e-beam on 3.10^4 Al radiator | ||
Line 5: | Line 5: | ||
* take data at each HV settings for about 20 files | * take data at each HV settings for about 20 files | ||
* HV steps: +/- 25V: | * HV steps: +/- 25V: | ||
− | ** HV = 1150, 1175, 1200, 1225, 1250, 1275, 1300 | + | ** HV = 1150, 1175, 1200, 1225, 1250, 1275, 1300 and new 1325, 1350 |
− | ** HV = 1125, 1100, 1075 | + | ** HV = 1125, 1100, 1075, and new: 1050, 1025 |
After the scan return to nominal running conditions as follows: | After the scan return to nominal running conditions as follows: | ||
Line 14: | Line 14: | ||
Check that the file at the top of the list is selected, this ends with 1_Dec_2019_ALL1150V.snap | Check that the file at the top of the list is selected, this ends with 1_Dec_2019_ALL1150V.snap | ||
Click Restore. | Click Restore. | ||
+ | |||
+ | == HV SCAN OF TOF PMTS WINTER 2023 == | ||
+ | * Beam conditions: 150nA e-beam on 3.10^4 Al radiator: the rates in all PMts should be well below 1MHz. | ||
+ | * start with 1150V for all PMTs | ||
+ | ** HV = 1150, 1100, 1050, 1200, 1250, 1300, 1350, 1400 | ||
+ | * take data at each HV settings for about 30 minutes | ||
+ | * after scan restore HV settings to lates values of the database. |
Latest revision as of 09:51, 13 January 2023
HV SCAN OF TOF PMTS
- Beam conditions: 180nA e-beam on 3.10^4 Al radiator
- start with 1150V for all PMTs
- take data at each HV settings for about 20 files
- HV steps: +/- 25V:
- HV = 1150, 1175, 1200, 1225, 1250, 1275, 1300 and new 1325, 1350
- HV = 1125, 1100, 1075, and new: 1050, 1025
After the scan return to nominal running conditions as follows:
On the TOF HV screen click save/restore. This opens a small window. Click restore HV parameter setpoints. This opens a larger window. Check that the file at the top of the list is selected, this ends with 1_Dec_2019_ALL1150V.snap Click Restore.
HV SCAN OF TOF PMTS WINTER 2023
- Beam conditions: 150nA e-beam on 3.10^4 Al radiator: the rates in all PMts should be well below 1MHz.
- start with 1150V for all PMTs
- HV = 1150, 1100, 1050, 1200, 1250, 1300, 1350, 1400
- take data at each HV settings for about 30 minutes
- after scan restore HV settings to lates values of the database.