Difference between revisions of "JEF meeting, April 24, 2020"
From GlueXWiki
(Created page with "Meeting time and location= 9:00 am EST (JLab time) Bluejeans only =Connection instructions= <div class="toccolours mw-collapsible mw-collapsed"> We are using [https://cc.jla...") |
|||
(One intermediate revision by one other user not shown) | |||
Line 22: | Line 22: | ||
=Agenda= | =Agenda= | ||
* SICCAS crystals | * SICCAS crystals | ||
+ | *: [https://halldweb.jlab.org/wiki/index.php/First_Batch_(192_crystals) First batch delivered to the Lab] -- Sasha | ||
* [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication] | * [https://halldweb.jlab.org/wiki/index.php/Module_Design Preparation for module fabrication] | ||
* COMCAL tests, TAC running, etc. | * COMCAL tests, TAC running, etc. | ||
* Preparations for PAC meeting (jeopardy) | * Preparations for PAC meeting (jeopardy) | ||
+ | |||
+ | =Minutes= | ||
+ | Attendees: Arshak,Igal,Varun,Zisis,Sasha,Jon,Jane,Josh,Susan,Tim B.,Liping,S.T. | ||
+ | *SICCAS crystals: 192 have arrived (132 for us + 60 for Hall C) | ||
+ | ** Sasha visually inspected all of them: all look good by eye (no evidence of yellowing) | ||
+ | ** Some have chips/issues with chamfer, will need more extensive tests, but gave okay for payment to Shanghai ceramics | ||
+ | ** Crystals stored in clean room, ready for further work once the lab reopens. | ||
+ | * New contract with SICCAS is progressing (slight price increase, but also include $50 for Jane's QA) | ||
+ | * Other outstanding items (mu-metal, brass flanges) are starting to arrive at the lab | ||
+ | * Sasha in contact with Fernando and Vlad P. regarding refurbishment of COMCAL electronics -- hopefully this summer? | ||
+ | * PAC preparation: Liping will work on JEF physics update talk, Sasha will work on FCAL-II presentation. | ||
+ | *Summer students: not clear when the lab will reopen and what restrictions will be in place when it does reopen. | ||
+ | ** Sasha will talk to Eugene regarding paperwork that can be done before lab reopening |
Latest revision as of 10:36, 24 April 2020
Meeting time and location= 9:00 am EST (JLab time) Bluejeans only
Connection instructions
We are using BlueJeans Video/Audio conferencing. Our meeting ID number is 992533564. Click "Expand" for more details.
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: 1 888 240 2560 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Agenda
- SICCAS crystals
- First batch delivered to the Lab -- Sasha
- Preparation for module fabrication
- COMCAL tests, TAC running, etc.
- Preparations for PAC meeting (jeopardy)
Minutes
Attendees: Arshak,Igal,Varun,Zisis,Sasha,Jon,Jane,Josh,Susan,Tim B.,Liping,S.T.
- SICCAS crystals: 192 have arrived (132 for us + 60 for Hall C)
- Sasha visually inspected all of them: all look good by eye (no evidence of yellowing)
- Some have chips/issues with chamfer, will need more extensive tests, but gave okay for payment to Shanghai ceramics
- Crystals stored in clean room, ready for further work once the lab reopens.
- New contract with SICCAS is progressing (slight price increase, but also include $50 for Jane's QA)
- Other outstanding items (mu-metal, brass flanges) are starting to arrive at the lab
- Sasha in contact with Fernando and Vlad P. regarding refurbishment of COMCAL electronics -- hopefully this summer?
- PAC preparation: Liping will work on JEF physics update talk, Sasha will work on FCAL-II presentation.
- Summer students: not clear when the lab will reopen and what restrictions will be in place when it does reopen.
- Sasha will talk to Eugene regarding paperwork that can be done before lab reopening