# Last 72 hours | # Last 72 hours | ||
− | #* Beam returned | + | #* Beam returned Saturday 4am |
+ | #* [https://logbooks.jlab.org/entry/3822407 Harp scan] | ||
+ | #* DAQ/HOSS problem: [https://logbooks.jlab.org/entry/3822565], [https://logbooks.jlab.org/entry/3822610] | ||
+ | #* Start of 350nA production cycle | ||
+ | #* Saturday swing: [https://logbooks.jlab.org/entry/3822570 AC bias testing], [https://logbooks.jlab.org/entry/3822726] | ||
# Reports/Issues | # Reports/Issues | ||
+ | #* Monitoring: [https://logbooks.jlab.org/entry/3822741 Saturday 5pm] | ||
# Run Plan | # Run Plan | ||
− | |||
== Friday, August 7 == | == Friday, August 7 == |
Revision as of 18:10, 8 August 2020
<- Back to Run Coordination Meetings:Summer2020
Monday, August 10
- Last 72 hours
- Beam returned Saturday 4am
- Harp scan
- DAQ/HOSS problem: [1], [2]
- Start of 350nA production cycle
- Saturday swing: AC bias testing, [3]
- Reports/Issues
- Monitoring: Saturday 5pm
- Run Plan
Friday, August 7
- Last 24 hours
- Diamond alignment check (Hovanes)
- Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
- Add screen shots of the coherent edges to logbook
- "force para" or "force perp", as appropriate, and "save as default" for each of the four settings
- Trigger check-out (Sasha)
- TagH and PS HV scan, interrupted by pass change
- Storm, optics tuning, several issues, transformer repair
- No beam since, expected only this afternoon
- Diamond alignment check (Hovanes)
- Reports/Issues
- Remind MCC to put in dumplet when changing radiators
- BCal Pulser?
- Monitoring:
- CPP Status
- Run Plan
- Access?
- Harp Scan
- Complete first production cycle with 350nA
Thursday, August 6
- Last 24 hours
- 5th pass separator problems after thunderstorm in the evening
- Beam recovered around midnight
- Harp scan: results
- Radiation levels checked: similar to spring
- Reports/Issues
- TagM was set to high gain mode during night, saturates, no meaningful data [4]
- Diamond alignment: coherent edge too far off (Beni)
- Bleed through from Hall B
- Run Plan
- Diamond alignment (Hovanes)
- Trigger, PS, TagH check (Sasha)
- Pass change at noon