Difference between revisions of "Run Planning Meeting Notes, August 27-September 2, 2020"
From GlueXWiki
(→Thursday, August 27) |
(→Thursday, August 27) |
||
Line 15: | Line 15: | ||
=Thursday, August 27= | =Thursday, August 27= | ||
# Last 24 hours: | # Last 24 hours: | ||
+ | #* Due to Hall C current increase request, accelerator experimented with the optics => MCC recommended a HARP scan | ||
#* Production | #* Production | ||
## [https://logbooks.jlab.org/entry/3835500 Many short trips - beam stable for 5 min and then trips] | ## [https://logbooks.jlab.org/entry/3835500 Many short trips - beam stable for 5 min and then trips] | ||
# Report/issues: | # Report/issues: | ||
+ | #* HARP scan failed: |
Revision as of 07:35, 27 August 2020
<- Back to Run Coordination Meetings:Summer2020
MEDCON 5 restrictions (Bob May email)
- adhere to counting room capacity restrictions
- maintain 6 ft. separation (briefly passing another person inside 6 ft. while moving about the counting room is inevitable and is OK)
- wear masks anytime more than one person present in the counting room
- at MEDCON 5 the lab has no cafeteria services because eating "cafeteria style" (eating in common from prepared food) is inconsistent with COVID-19 controls. Staging food in the counting room to share is inconsistent with MEDCON 5 COVID-19 controls.
- food and drink consumption - because it requires removing face coverings to consume - should be limited to packaged food and drink brought for personal use that is consumed while maintaining at least 6 ft. from the nearest person and ideally, consumed in a separate room from others.
Thursday, August 27
- Last 24 hours:
- Due to Hall C current increase request, accelerator experimented with the optics => MCC recommended a HARP scan
- Production
- Report/issues:
- HARP scan failed: