Difference between revisions of "Preparation for 2021 Run"
From GlueXWiki
Line 2: | Line 2: | ||
− | ;Aligning FCAL in the Hall <span style="color:brown"> | + | ;Aligning FCAL in the Hall <span style="color:brown"> -- Coordinated by '''Tim Whitlatch''' </span> |
: Moving FCAL platform by about 5 mm in X-direction to make sure that the beam goes through the middle of the FCAL hole (3x3 modules). The exact position of the platform should be confirmed by the alignment group | : Moving FCAL platform by about 5 mm in X-direction to make sure that the beam goes through the middle of the FCAL hole (3x3 modules). The exact position of the platform should be confirmed by the alignment group | ||
− | ;Perform preventative replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events <span style="color:brown"> | + | ;Perform preventative replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events <span style="color:brown"> -- Support needed from '''Chris Stanislav, Fernando Barbosa, Matt Shepherd''' </span> |
: Several bases have already been replaced in this area. The status of FCAL bases in the 3 inner FCAL rings was provided by Colin and is presented in the link below. | : Several bases have already been replaced in this area. The status of FCAL bases in the 3 inner FCAL rings was provided by Colin and is presented in the link below. | ||
:[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings] | :[https://logbooks.jlab.org/entry/3810770 Status of FCAL dividers in 3 inner rings] | ||
− | ;Perform preventative maintenance of FCAL bases, which draw excessive current <span style="color:brown"> | + | ;Perform preventative maintenance of FCAL bases, which draw excessive current <span style="color:brown"> -- Support needed from '''Chris Stanislav, Fernando Barbosa, Matt Shepherd''' </span> |
:Diagnose and subsequently replace (reapair) bases which draw excessive current (typically larger than 15 mA), which is an indication of the possible failure. Currently estimate about 200 - 300 such bases | :Diagnose and subsequently replace (reapair) bases which draw excessive current (typically larger than 15 mA), which is an indication of the possible failure. Currently estimate about 200 - 300 such bases | ||
− | ;Refurbish CCAL active bases <span style="color:brown"> | + | ;Refurbish CCAL active bases <span style="color:brown"> -- Support needed from Chris Stanislav and Fernando Barbosa </span> |
: manufacture 150 new active bases according to modifications by V. Popov and install them on the CCAL | : manufacture 150 new active bases according to modifications by V. Popov and install them on the CCAL | ||
: Chris has already prepared a new PCB design | : Chris has already prepared a new PCB design |
Revision as of 17:12, 10 September 2020
Below is a list of action items which we would like accomplish before the PrimEx Phase II run in Spring/Summer of 2021
- Aligning FCAL in the Hall -- Coordinated by Tim Whitlatch
- Moving FCAL platform by about 5 mm in X-direction to make sure that the beam goes through the middle of the FCAL hole (3x3 modules). The exact position of the platform should be confirmed by the alignment group
- Perform preventative replacement of FCAL bases in 4 inner rings, which is critical for reconstruction of Compton events -- Support needed from Chris Stanislav, Fernando Barbosa, Matt Shepherd
- Several bases have already been replaced in this area. The status of FCAL bases in the 3 inner FCAL rings was provided by Colin and is presented in the link below.
- Status of FCAL dividers in 3 inner rings
- Perform preventative maintenance of FCAL bases, which draw excessive current -- Support needed from Chris Stanislav, Fernando Barbosa, Matt Shepherd
- Diagnose and subsequently replace (reapair) bases which draw excessive current (typically larger than 15 mA), which is an indication of the possible failure. Currently estimate about 200 - 300 such bases
- Refurbish CCAL active bases -- Support needed from Chris Stanislav and Fernando Barbosa
- manufacture 150 new active bases according to modifications by V. Popov and install them on the CCAL
- Chris has already prepared a new PCB design