Difference between revisions of "Π polarizability Meeting Mar 17, 2021"
From GlueXWiki
(→Action Items) |
(→Preliminary Agenda) |
||
Line 50: | Line 50: | ||
# Action Items | # Action Items | ||
# [[CPP and NPP Readiness Review]] | # [[CPP and NPP Readiness Review]] | ||
+ | # Responses to the ERR | ||
+ | ## MWPCs (fabrication, testing) | ||
+ | ## Trigger rates (beam test analysis, expectation with target pulled back) | ||
+ | ## Simulation -hdgeant4 (initial setup and plan for running simulations) | ||
+ | ## Analysis (low level reconstruction, monitoring, higher level analysis) | ||
+ | ## Rates in MWPCs | ||
+ | ## Timeline to publication | ||
+ | ## Table of responsibilities | ||
# GlueX Data Analysis | # GlueX Data Analysis | ||
# CPP Software | # CPP Software |
Revision as of 09:22, 16 March 2021
Meeting Time And Location
09:00 EST (JLab time) Weekly Meeting
REMOTE during Covid-19
Connecting
You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 949 429 419
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: (408) 740-7256 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Action Items
- Draft list of responses to the ERR recommendations for discussion (Elton)
Preliminary Agenda
- Previous CPP meeting: Mar 10, 2021
- Announcements
- Action Items
- CPP and NPP Readiness Review
- Responses to the ERR
- MWPCs (fabrication, testing)
- Trigger rates (beam test analysis, expectation with target pulled back)
- Simulation -hdgeant4 (initial setup and plan for running simulations)
- Analysis (low level reconstruction, monitoring, higher level analysis)
- Rates in MWPCs
- Timeline to publication
- Table of responsibilities
- GlueX Data Analysis
- CPP Software
- PID + AI
- Other business
- Next meeting
Minutes
Attending: