Line 45: | Line 45: | ||
=Saturday, September 18= | =Saturday, September 18= | ||
# Last 24 hours: | # Last 24 hours: | ||
− | #* | + | #* AC Fixed at 9:30 am |
− | #** Day Shift summary: https://logbooks.jlab.org/entry/3906056 | + | #** Voltage cable was attached but not locked. |
− | # | + | # Shift Summary: |
− | # | + | #* Day Shift summary: https://logbooks.jlab.org/entry/3906056 |
+ | #* Swing summary: https://logbooks.jlab.org/entry/3906229 | ||
+ | #* Owl summary: https://logbooks.jlab.org/entry/3906383 | ||
#** Early Riser Summary: https://logbooks.jlab.org/entry/3906545 | #** Early Riser Summary: https://logbooks.jlab.org/entry/3906545 | ||
− | + | ||
− | + | ||
− | # | + | # Overnight: snake scan. |
− | # | + | # Present: snake scan ongoing. |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
#** Radcon is escorting Nick into the collimator cave for checking | #** Radcon is escorting Nick into the collimator cave for checking | ||
#* Counting house microphone issue: | #* Counting house microphone issue: | ||
− | #** | + | #** Good enough for now. Fin tweak needed. Remote shifters: please give feedback. |
− | + | ||
# Run plan | # Run plan | ||
− | #* | + | #* TAGM checkout to be completed (Richard) |
− | #* | + | #* Beryllium target installation |
− | #* | + | #** 6:30am, Beam. |
− | #** | + | #** 7:00am- 7:30am, radcon survey of beamline target area. |
− | #* | + | #** 7:30am- 8:00am, Survey & alignment setup |
− | #* | + | #** 8:00am-8:30am, removing components (Target & start counter) |
+ | #** 8:30am, Berylium target installaion by target group (with Imani's presents) | ||
+ | #** Total work duration: 14 hours | ||
+ | #** Currently planned for Monday. | ||
+ | #* A Possibility of mantainace day on Tuesday. |
Revision as of 09:47, 18 September 2021
<- Back to Run Coordination Meetings:Summer2021
Tuesday, September 16
- Last 24 hours:
- 5th Separator went well. Succifent Separatoion achieved.
- Shift started at 10 pm last night.
- Owl summary: https://logbooks.jlab.org/entry/3905917
- Early riser summary: https://logbooks.jlab.org/entry/3905955
- Beam is being setup/established to Hall D right now
- CW and three Hall operations are expected at the end of the day shift.
- Report/issue
- Remote shifter feedback on Blue Jeans connection: sound is intermittent. Currently, not workable. https://logbooks.jlab.org/entry/3905912
- TAGM scaler reset: https://logbooks.jlab.org/entry/3905724
- News on hydra
- PS Magnet is still turned off
- Run plan
- Wait for beam delivery. Begin experiment commissioning. Run plan
Friday, September 17
- Last 24 hours:
- Tune beam round yesterday noon. Good quality CW into the tagger at 15:00
- Day Shift summary: https://logbooks.jlab.org/entry/3906056
- Swing summary: https://logbooks.jlab.org/entry/3906229
- Owl summary: https://logbooks.jlab.org/entry/3906383
- Early Riser Summary: https://logbooks.jlab.org/entry/3906545
- Tune beam round yesterday noon. Good quality CW into the tagger at 15:00
- HARP Scan results: https://logbooks.jlab.org/entry/3906296
- Signal to background too high or pedestal shifted (require adjustment)? : https://logbooks.jlab.org/entry/3906283
- Tagger Gamma counter rate comparison: last night vs 2020 for same radiator: https://logbooks.jlab.org/entry/3906326
- Evident suggest pedestal for the Halo monitor shifted
- Empty target run overnight
- Without Active collimator
- Report/issue
- AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
- Radcon is escorting Nick into the collimator cave for checking
- Counting house microphone issue:
- Improved significantly by the new microphone by Matt
- A longer USB to micro USB cable will further improve the remote shift experience
- AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
- Run plan
- Run plan
- Complete beam configuration (Hovanes) after fixing Active collimator
- Detector checkout
- Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: .
- Low Current 2nA run this afternoon (during Mike's shift)
- Empty target run again overnight?
Saturday, September 18
- Last 24 hours:
- AC Fixed at 9:30 am
- Voltage cable was attached but not locked.
- AC Fixed at 9:30 am
- Shift Summary:
- Day Shift summary: https://logbooks.jlab.org/entry/3906056
- Swing summary: https://logbooks.jlab.org/entry/3906229
- Owl summary: https://logbooks.jlab.org/entry/3906383
- Early Riser Summary: https://logbooks.jlab.org/entry/3906545
- Overnight: snake scan.
- Present: snake scan ongoing.
- Radcon is escorting Nick into the collimator cave for checking
- Counting house microphone issue:
- Good enough for now. Fin tweak needed. Remote shifters: please give feedback.
- Run plan
- TAGM checkout to be completed (Richard)
- Beryllium target installation
- 6:30am, Beam.
- 7:00am- 7:30am, radcon survey of beamline target area.
- 7:30am- 8:00am, Survey & alignment setup
- 8:00am-8:30am, removing components (Target & start counter)
- 8:30am, Berylium target installaion by target group (with Imani's presents)
- Total work duration: 14 hours
- Currently planned for Monday.
- A Possibility of mantainace day on Tuesday.