Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Thursday November 04) |
(→Thursday November 04) |
||
Line 15: | Line 15: | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
#* Continue production at 200nA with the solenoid on | #* Continue production at 200nA with the solenoid on | ||
− | |||
#* Beam energy change planned for 11/05-11/07, start Friday ~7am | #* Beam energy change planned for 11/05-11/07, start Friday ~7am | ||
#** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall? | #** RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall? | ||
#** Safety Walkthrough scheduled for Friday 2pm | #** Safety Walkthrough scheduled for Friday 2pm | ||
#** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am | #** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am |
Revision as of 08:16, 4 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all put 'one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am