Difference between revisions of "Run Planning Meeting Notes, June 16 - June 22, 2022"
From GlueXWiki
(→Friday June 17) |
(→Friday June 17) |
||
Line 15: | Line 15: | ||
#*Harp scans performed [https://logbooks.jlab.org/entry/4003556][https://logbooks.jlab.org/entry/4003571][https://logbooks.jlab.org/entry/4003586] | #*Harp scans performed [https://logbooks.jlab.org/entry/4003556][https://logbooks.jlab.org/entry/4003571][https://logbooks.jlab.org/entry/4003586] | ||
#*[https://logbooks.jlab.org/entry/4003600 Beam envelope looks good] | #*[https://logbooks.jlab.org/entry/4003600 Beam envelope looks good] | ||
− | #*No CH edge observed. Hovanes helped to get diamond aligned overnight. | + | #*No CH edge observed. Hovanes helped to get diamond aligned overnight. [https://logbooks.jlab.org/entry/4003627] |
#*Ran quasi production for NPP. Pressure change CDC alarm twice. | #*Ran quasi production for NPP. Pressure change CDC alarm twice. | ||
#Reports | #Reports | ||
#*From PD-RC 7:45 meeting. | #*From PD-RC 7:45 meeting. | ||
− | #** | + | #**Hall C not getting high current, more work is needed |
+ | #**Hall B will need a spin dance | ||
#*[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | #*[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
#Issues | #Issues |
Revision as of 08:24, 17 June 2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Friday June 17
- Last 24h:
- Tagger voltage alarms
- Nick changed card and slot again. Same issue. He set the max voltage to 1100 V so an overvoltage is less serious. The next step is to change the crate which would take a shift and need 2 people.
- Hovanes turned counters off
- Beam returned at 11 pm.
- Harp scans performed [1][2][3]
- Beam envelope looks good
- No CH edge observed. Hovanes helped to get diamond aligned overnight. [4]
- Ran quasi production for NPP. Pressure change CDC alarm twice.
- Tagger voltage alarms
- Reports
- From PD-RC 7:45 meeting.
- Hall C not getting high current, more work is needed
- Hall B will need a spin dance
- Spreadsheet with list of runs
- From PD-RC 7:45 meeting.
- Issues
- 24 tagger channels off
- Plans
- Flux optimization/Act .Col. calibration
- Trigger development for TOF trigger
- RF recovery Tuesday
- Accelerator maintenance day Thursday
- Trigger development for TOF trigger
- Commissioning steps temporarily postponed:
- PS and TAGH HV scans
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
Thursday June 16
- Last 24h:
- No beam since last meeting
- Still getting tagger voltage alarms (should we just turn those counters off?)
- Reports
- From PD-RC 7:45 meeting.
- Beam will be gone until Swing Shift at least
- Spreadsheet with list of runs
- From PD-RC 7:45 meeting.
- Issues
- High trigger rate in CTOF
- MWPC #6 window cover removed. If successful, great. Otherwise, attempt to move helium bag downstream.
- High trigger rate in CTOF
- Plans:
- Upcoming Items:
- PS and TAGH HV scans
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.
- Tagger Access:
- Change HV crate (Nick, Chris)
- Install helicity fibers and connect to DAQ