Difference between revisions of "Run Planning Meeting Notes, June 23 - June 29, 2022"
From GlueXWiki
(→Thursday June 23) |
(→Thursday June 23) |
||
Line 17: | Line 17: | ||
#*[https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low] | #*[https://logbooks.jlab.org/entry/4005967 Bleedthrough beam current was very low] | ||
#*Wed evening: The target is out already. Sasha will set up the straight track trigger, then start the TAC run at whatever beam current was chosen earlier. | #*Wed evening: The target is out already. Sasha will set up the straight track trigger, then start the TAC run at whatever beam current was chosen earlier. | ||
− | #Shift Summaries | + | #Shift Summaries [https://logbooks.jlab.org/entry/4005862 day] |
#Reports | #Reports | ||
#Issues | #Issues |
Revision as of 16:29, 22 June 2022
↑ Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Thursday June 23
- Last 24h:
- Inadvertent change to tagger magnet settings backed out
- Target moved out
- Richard took the microscope scan data
- Bleedthrough beam current was very low
- Wed evening: The target is out already. Sasha will set up the straight track trigger, then start the TAC run at whatever beam current was chosen earlier.
- Shift Summaries day
- Reports
- Issues
- Tagger NMR
- DIRC sensor
- DAQ livetime
- Beam position stability
- U1-10-TOP MPOD crate
- Plans
- No beam from 6:30am until sometime after 3pm, power shedding.
- Walk-through at 11am
- Commissioning steps temporarily postponed:
- Flux optimization/Act .Col. calibration
- Bleed-through test: measure bleed-through with A slit as usual and A slit completely closed to see whether using B slit would help.