Difference between revisions of "Run Planning Meeting Notes, July 14 - July 20, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Friday July 16) |
||
Line 26: | Line 26: | ||
* [https://logbooks.jlab.org/entry/4015226 Day shift summary] | * [https://logbooks.jlab.org/entry/4015226 Day shift summary] | ||
* [https://logbooks.jlab.org/entry/4015409 Swing shift summary] | * [https://logbooks.jlab.org/entry/4015409 Swing shift summary] | ||
− | * [ Owl shift summary] | + | * [https://logbooks.jlab.org/entry/4015548 Owl shift summary] |
* [ Early Riser shift summary] | * [ Early Riser shift summary] | ||
Revision as of 06:36, 15 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Friday July 16
Past 24 hours
- RF Recovery Day
- Access to investigate DIRC environment parameters (Nick)
- Access to install crystals for testing in the PS Test Setup (Vlad and Sasha)
- DIRC Environment (Tim)
- Recycled power on BCAL LED crate (Elton/Mark)
- FCAL Base Replaced (Malte/Mark]
- Program when beam comes back
- Solenoid ramped up to 1350 A (Tim)
- Production on Empty target (~xxxx B events)
Shift Reports
- Day shift summary
- Swing shift summary
- Owl shift summary
- [ Early Riser shift summary]
Reports
- Single pi0 production (Beni)
- omega signal in FCAL (Simon)
Issues
- Stability of beam position at Active Collimator
- itrigger errors in monitoring plots
- Hydra not running (Naomi)
Features
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
Thursday July 14
Past 24 hours
- Request for a Schedule Adjustment from Jul 27 to Aug 17 has been submitted.
- Production on Full Pb target (~0.5 B events)
- Install Empty Target (12 pm)
- Production on Empty Target (~0.9 B events). Need about twice that. After checking statistics today, I suggest we stay on Empty Target, but run at 60 nA after maintenance.
- Storm Takes Down Accelerator
- Smooth, but trippy, beam after recovery. Trips are at about 15-20 trips/hr
Shift Reports
Reports
Issues
- We would like to add the TOF and CTOF trigger rates to EPICs/archiver
Plans
- RF Recovery today (beam down 8.15 till ~5pm)
- HD Refrigerator Maintenance
- Access for Sasha and Vlad to install modules in PS Test Stand
- Nick to work on DIRC environment
- Following Maintenance: Plan to continue with Empty Target data to complete the data taking cycle and then continue at 60 nA