Line 8: | Line 8: | ||
[https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | [https://docs.google.com/spreadsheets/d/1sdluzy7p5vnlhw9AWJHBrYbXKTBet45o4den4zWX9dc/edit#gid=1855021251 Spreadsheet with list of runs] | ||
+ | |||
+ | = Tuesday July 26 = | ||
+ | |||
+ | === Past 24 hours === | ||
+ | * Switched to Pb target, approx 2.7 B triggers in the past 24 hours | ||
+ | |||
+ | === Shift Reports === | ||
+ | * [https://logbooks.jlab.org/entry/4019380 Day shift summary ] | ||
+ | * [https://logbooks.jlab.org/entry/4019457 Swing shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4019548 Owl shift summary] | ||
+ | * [https://logbooks.jlab.org/entry/4019620 Early Riser shift summary] | ||
+ | |||
+ | === Reports === | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4019447 Some TagH scalars are high with no beam] A. Hurley | ||
+ | * [https://logbooks.jlab.org/entry/4019388 Nice clean omega] Beni | ||
+ | |||
+ | === Plans === | ||
+ | * Switch to full target running after the RC meeting | ||
+ | |||
= Monday July 25 = | = Monday July 25 = |
Revision as of 13:08, 25 July 2022
Back to Run Coordination Meetings:Summer2022
Meeting are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Contents
Tuesday July 26
Past 24 hours
- Switched to Pb target, approx 2.7 B triggers in the past 24 hours
Shift Reports
Reports
- Some TagH scalars are high with no beam A. Hurley
- Nice clean omega Beni
Plans
- Switch to full target running after the RC meeting
Monday July 25
Past 24 hours
- Data taking on empty target, approx 2.7 B triggers in the past 24 hours
Shift Reports
Reports
- Some TagH scalars are high with no beam A. Hurley
- Nice clean omega Beni
Plans
- Switch to full target running after the RC meeting
Sunday July 24
Past 24 hours
- Data taking on empty target, approx 2.8 B triggers in the past 24 hours
Shift Reports
Reports
- 3 bases and 1 PMT swapped in FCAL Mark
- Discriminator problem in rocTAGH2 slot 18 Hovannes
- Tagger hodoscope scalar channels frozen Thomas
Plans
- Continue taking data on empty target until Monday morning.
Saturday July 23
Past 24 hours
- Data taking on empty target, approx 2.7 B triggers in the past 24 hours
Shift Reports
Reports
Plans
- In discussions Friday after the RC meeting it was decided to continue data taking on empty target until Monday morning. Then switch to full target.
Friday July 22
Past 24 hours
- Data taking on empty target, approx 2.1 B triggers in the past 24 hours
- Priority for beam delivery shifts to Hall D today
Shift Reports
Reports
- Followup on backgrounds seen in coherent pi0 photo-production on lead] Beni
- Updated firmware for fadc250 rocfcal2, slot13 Sasha
- FCAL Hit Local Time after the fix
- Trigger rates with amorphous radiator and empty target Y. Wolf
- TOF and CTOF trigger rates recorded to EPICS Sasha
- CTOF paddle 3 PMT tripped David L.
Plans
- Continue data taking on empty target until ~ 17:00 today, then switch to full target for running over the weekend
Thursday July 21
Past 24 hours
- ROCFDC11 Slot 19 FADC125 (possibly?) repaired
- Solenoid final ramp to 1350 A ~ 5:00 AM
- Beam returns ~ 5:00 AM
- Harp scans
- Start data taking on empty target ~ 6:00 AM
Shift Reports
Reports
- see etas Beni
- 7 FCAL bases changed Mark
- Changed CPP chamber gas flow Tim
- HD solenoid update Tim
- Strange solenoid MPS GUI state Hovannes
- Solenoid final ramp to 1350 A Tim
- Harp scan 5C11
- Harp scan 5C11B
- Radiator wire scan Hovannes
- Extrapolations from today’s wire scans Hovannes
- FCAL hit local time looks weird Ksuresh
- Trigger plots for the run don’t match reference Ksuresh
- BCAL hot channel? Ksuresh
Plans
- Continue data taking on empty target