Difference between revisions of "Run Planning Meeting Notes, September 22 - September 28, 2022"
From GlueXWiki
(→Past 24 Hours) |
(→Thursday, September 22) |
||
Line 11: | Line 11: | ||
=Thursday, September 22= | =Thursday, September 22= | ||
=== Past 24 Hours === | === Past 24 Hours === | ||
− | *12 runs collected totaling | + | *12 runs collected totaling 2.1B events collected |
*No beam for 1h and 20min | *No beam for 1h and 20min | ||
*[https://logbooks.jlab.org/entry/4044872 New Active Collimator Orbit Lock was calibrated successfully] | *[https://logbooks.jlab.org/entry/4044872 New Active Collimator Orbit Lock was calibrated successfully] |
Revision as of 05:55, 22 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, September 22
Past 24 Hours
- 12 runs collected totaling 2.1B events collected
- No beam for 1h and 20min
- New Active Collimator Orbit Lock was calibrated successfully
- Shift summaries:
Issues
- DB not up-to-date, no info after 0155 and beam current is wrong for some runs
- DAQ Stopped Refreshing and Needed to be Restarted (Tyler)
Plan
- Take production data at 200nA with Full target