Difference between revisions of "Run Planning Meeting Notes, September 22 - September 28, 2022"
From GlueXWiki
(→Plan) |
|||
Line 14: | Line 14: | ||
**[https://logbooks.jlab.org/entry/4045170 0400-1000 22/09] | **[https://logbooks.jlab.org/entry/4045170 0400-1000 22/09] | ||
=== Past 24 Hours === | === Past 24 Hours === | ||
− | === Issues = | + | === Issues === |
* [[Excursions in Hall D beam positions]] (Brian/Hovanes) | * [[Excursions in Hall D beam positions]] (Brian/Hovanes) | ||
Revision as of 20:50, 22 September 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Contents
Friday, September 23
- Shift summaries
Past 24 Hours
Issues
- Excursions in Hall D beam positions (Brian/Hovanes)
Plan
- Take production data at 200nA with Full target
Thursday, September 22
Past 24 Hours
- 12 runs collected totaling 2.1B events collected
- No beam for 1h and 20min
- New Active Collimator Orbit Lock was calibrated successfully
- Shift summaries:
Issues
- DB not up-to-date, no info after 110855 and beam current is wrong for some runs (110846, 110850, & 110855)
- DAQ Stopped Refreshing and Needed to be Restarted (Tyler)
Plan
- Take production data at 200nA with Full target