Difference between revisions of "Run Planning Meeting Noters, November 9- November 16, 2022"
From GlueXWiki
(→Past 24 hours) |
(→Shift Summary) |
||
Line 20: | Line 20: | ||
* [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ] | * [https://logbooks.jlab.org/entry/4079165 Day Nov 9 ] | ||
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4079301 Swing Nov 9] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4079521 Owl Nov9/10] |
− | * [https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4079755 Early riser Nov 10] |
=== Issues/Reports === | === Issues/Reports === |
Revision as of 08:09, 10 November 2022
Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)
Hall D counting room white board
Back to Run Coordination Meetings:Fall2022
Thursday, November 10
Past 24 hours
- No beam for ~14 hours (5:15-19:30) due to beam tuning and cryomodule issues.
- Did harp scan when the beam was back during swing shift https://logbooks.jlab.org/entry/4079511. The sigmas of u and y positions at radiator are somewhat larger and lie outside the preferred range, need to monitor PS rates.
- Took production data on Full LHe target. Since yesterday we collected 1.9 B events.
Shift Summary
Issues/Reports
- No beam for ~14 hours due to beam tuning issues, followed by issues with some of the cryomodules.
Plan
- Continue with Full target production.