===Past 24 hours=== | ===Past 24 hours=== | ||
− | * | + | * Dropped to RESTRICTED for tours at 4:00pm 3/16 |
− | + | ** Visits ended by 7:30pm | |
− | + | ** Hall D swept and requested beam restoration | |
− | ** | + | ** Started off with new harp scans, then continued production |
− | + | ||
− | + | ||
− | ** | + | |
− | ** | + | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
===Shift Reports=== | ===Shift Reports=== | ||
Line 40: | Line 31: | ||
===Issues=== | ===Issues=== | ||
− | + | ||
− | *[https://logbooks.jlab.org/entry/ | + | * [https://logbooks.jlab.org/entry/4150467 Parsing issue with rocBCAL7 (rocID=37 and slot=16)], suggest FADC250 replacement |
− | *[https://logbooks.jlab.org/entry/ | + | |
− | --> | + | ===Plans=== |
+ | * Another high current run at 900 nA during the day today | ||
+ | ** we still have ~8hr of 900nA running in our allowance -- discussed at 8:00 meeting | ||
+ | ** main participants needed: Justin, Sasha, Lubomir, Naomi | ||
+ | ** trigger conditions already established for stable DAQ at 75kHz event rate @ 900nA [https://logbooks.jlab.org/entry/4150252][https://logbooks.jlab.org/entry/4150309] | ||
+ | * Continue running production | ||
+ | * Straight-track run ~50nA | ||
+ | ** planned for March 19th Sunday swing | ||
+ | ** magnetic field ramped down | ||
+ | ** access not required | ||
+ | ** people to contact: Justin, Sasha, Lubomir, Naomi | ||
+ | * After beam goes away, one shift of BCAL LED data requsted -- Mark Dalton, Varun | ||
+ | |||
+ | ==Plans on Accelerator Side== | ||
+ | * Hall C running continues, no apparent issues that might interrupt them before Monday | ||
+ | |||
+ | ===Regular Production Cycle=== | ||
+ | *Production (300 nA, 2h runs) with cycle: | ||
+ | **2 runs PARA (0/90) | ||
+ | **'''3''' runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ) | ||
+ | **2 runs PARA (45/135) | ||
+ | **2 runs PERP (45/135) | ||
+ | **1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI) | ||
+ | |||
+ | ==Thursday March 16== | ||
+ | ===Past 24 hours=== | ||
+ | * Tagger Hall Access requested by Hovanes | ||
+ | ** came as a surprise to RADCON and MCC crew | ||
+ | ** discussion during the 8:00 meeting | ||
+ | ** we can do better | ||
+ | * High current run(900 nA) | ||
+ | ** initially blocked by Crew Chief -- discussed at 8:00 meeting | ||
+ | ** eventually granted after some delay | ||
+ | ** main participants Justin, Sasha, Lubomir, Naomi | ||
+ | ** trigger conditions eventually found that allow running at 75kHz data rate @ 900nA [https://logbooks.jlab.org/entry/4150252][https://logbooks.jlab.org/entry/4150309] | ||
+ | |||
+ | ===Shift Summaries=== | ||
+ | |||
+ | ===Reports=== | ||
+ | |||
+ | * [https://logbooks.jlab.org/entry/4150494#comment-44083 Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)] | ||
+ | * [https://logbooks.jlab.org/entry/4150233 Summary of trigger threshold scan and 1 billion events collected at 900 nA] | ||
+ | |||
+ | ===Issues=== | ||
* [https://logbooks.jlab.org/entry/4150467 Parsing issue with rocBCAL7 (rocID=37 and slot=16)], suggest FADC250 replacement | * [https://logbooks.jlab.org/entry/4150467 Parsing issue with rocBCAL7 (rocID=37 and slot=16)], suggest FADC250 replacement |
Revision as of 07:25, 17 March 2023
Zoom Connect Meeting ID: 160 199 0060 / Passcode 8394 MCC Whiteboard Hall D counting room white board Spreadsheet with list of runs Integrated Trigger Count Hall D Logbook
Contents
Thursday March 16
Past 24 hours
- Dropped to RESTRICTED for tours at 4:00pm 3/16
- Visits ended by 7:30pm
- Hall D swept and requested beam restoration
- Started off with new harp scans, then continued production
Shift Reports
Reports
- Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)
- Summary of trigger threshold scan and 1 billion events collected at 900 nA
Issues
- Parsing issue with rocBCAL7 (rocID=37 and slot=16), suggest FADC250 replacement
Plans
- Another high current run at 900 nA during the day today
- Continue running production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
- After beam goes away, one shift of BCAL LED data requsted -- Mark Dalton, Varun
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
Thursday March 16
Past 24 hours
- Tagger Hall Access requested by Hovanes
- came as a surprise to RADCON and MCC crew
- discussion during the 8:00 meeting
- we can do better
- High current run(900 nA)
Shift Summaries
Reports
- Summary of > 480 nA current running this period (60% of 24 hours utilized to this point)
- Summary of trigger threshold scan and 1 billion events collected at 900 nA
Issues
- Parsing issue with rocBCAL7 (rocID=37 and slot=16), suggest FADC250 replacement
Plans
- Continue running production
- Visitors tour of Hall D starts at 4:45pm 3/16
- Data collection should end sometime after 4:00pm, when convenient before 4:20
- Contact MCC and ask to drop Hall D to RESTRICTED, tagger hall not affected
- Ask them to contact RADCON to sweep Hall D for the visit
- Visit should end by 6:45pm
- As soon as they leave, put Hall D back in Power Permit and request beam restoration
- Start off with new harp scans, then continue production
- Straight-track run ~50nA
- planned for March 19th Sunday swing
- magnetic field ramped down
- access not required
- people to contact: Justin, Sasha, Lubomir, Naomi
Plans on Accelerator Side
- Hall C running continues, no apparent issues that might interrupt them before Monday
Regular Production Cycle
- Production (300 nA, 2h runs) with cycle:
- 2 runs PARA (0/90)
- 3 runs PERP (0/90) (one additional run per cycle for next 2 cycles, to catch up with PARA 0/90 -RTJ)
- 2 runs PARA (45/135)
- 2 runs PERP (45/135)
- 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)