Difference between revisions of "Commissioning run plan"
From GlueXWiki
(Created page with "# Initial ECAL gain calibration using Compton scattering events * run at small small photon flux; use low-energy TAGH counters to constrain the total energy * Run conditions...") |
|||
Line 1: | Line 1: | ||
− | + | '''Initial ECAL gain calibration using Compton scattering events''' | |
* run at small small photon flux; use low-energy TAGH counters to constrain the total energy | * run at small small photon flux; use low-energy TAGH counters to constrain the total energy |
Revision as of 09:21, 6 September 2024
Initial ECAL gain calibration using Compton scattering events
- run at small small photon flux; use low-energy TAGH counters to constrain the total energy
- Run conditions:
- - amorphous radiator 10-4 R.L., 100 nA beam current
- - ECAL & FCAL ( & BCAL trigger), small energy threshold on the total energy (TBD)
- - run duration (TBD)