Difference between revisions of "June 25, 2009 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 26: | Line 26: | ||
# Review of Action Items | # Review of Action Items | ||
# Calibration | # Calibration | ||
− | # BCAL Fabrication | + | # BCAL Fabrication (Zisis) |
#* Contract status | #* Contract status | ||
#* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg01042.html Construction prototype update] | #* [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg01042.html Construction prototype update] |
Revision as of 01:27, 25 June 2009
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting(s)
- Resolution studies
- Study impact of inactive material at the end of BCAL on acceptance.
- Documentation on fiber first-article
- Review calibration procedures
- Update cost estimates
- light guides (USM)
- temperature stabilization (Tim and Fernando)
- summing circuits for SiPMs (Fernando)
- Impact of gain variations on resolution (especially for summed SiPMs) (Elton)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- Calibration
- BCAL Fabrication (Zisis)
- Contract status
- Construction prototype update
- Results from First Shipment of Production Fibers
- Sample exponential fits: Media:JS008graphs.png
- Attenuation Length by Lot Number: Media:FiberShip01.png
- Attenuation Length for all fibers (151 tested to date): Media:cummulativehist.png
- FCAL Update
- MOU, sow (Elton, Matt)
- Simulations (Sasha)
- Backgrounds from Cerenkov light
- Acceptance loss due to light guides
- BCAL Readout
- Update from USM (Will)
- Cost comparisons (Elton)
- Discussion of Bcal Readout Review (July 21)
- Stefano Miscetti can participate in the review via video. A test of ESNET connection yesterday was very successful.
- Other reviewers?
- Agenda
Minutes
Attendees: