=Items for followup from previous meeting(s)= | =Items for followup from previous meeting(s)= | ||
# Procedure to avoid vaseline in Bcal fabrication needs to be approved. | # Procedure to avoid vaseline in Bcal fabrication needs to be approved. | ||
− | # Resolution studies | + | # Resolve shipping procedures for Baby Cal. |
− | #* Study impact of inactive material at the end of BCAL on acceptance. | + | # <strike> Resolution studies |
+ | #* Study impact of inactive material at the end of BCAL on acceptance. (Mihajlo and Sasha) </strike> | ||
# Documentation on fiber first-article | # Documentation on fiber first-article | ||
# Review calibration procedures | # Review calibration procedures | ||
Line 17: | Line 18: | ||
#* light guides (USM) | #* light guides (USM) | ||
#* temperature stabilization (Tim and Fernando) | #* temperature stabilization (Tim and Fernando) | ||
− | #* summing circuits for SiPMs (Fernando) | + | #* <strike> summing circuits for SiPMs (Fernando) </strike> |
# <strike> Impact of gain variations on resolution (especially for summed SiPMs) (Elton) </strike> | # <strike> Impact of gain variations on resolution (especially for summed SiPMs) (Elton) </strike> | ||
Revision as of 12:11, 8 July 2009
Teleconference Time: 11:00 a.m. EST
- ESNET and EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 77438230# (remember the "#"). Note: code changed 7/2/09
Contents
Items for followup from previous meeting(s)
- Procedure to avoid vaseline in Bcal fabrication needs to be approved.
- Resolve shipping procedures for Baby Cal.
-
Resolution studies- Study impact of inactive material at the end of BCAL on acceptance. (Mihajlo and Sasha)
- Documentation on fiber first-article
- Review calibration procedures
- Update cost estimates
- light guides (USM)
- temperature stabilization (Tim and Fernando)
-
summing circuits for SiPMs (Fernando)
-
Impact of gain variations on resolution (especially for summed SiPMs) (Elton)
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- BCAL Fabrication (Zisis)
- Contract status
- FCAL Update
- MOU, sow (Elton, Matt)
- Simulations
- BCAL Readout
- Update from USM (Will)
- Bcal Readout Review (July 21)
- Reviewers: Stefano Miscetti (INFN) via video, Stepan Stepanyan (Hall B) and Howard Fenker (Hall C)
- Tentative schedule: July 10: pre-brief material, July 16: slides for presentations.
- Web page: []
- Other business
Minutes
Attendees: