Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
(→Collimator Cave) |
|||
Line 26: | Line 26: | ||
* Conceptual design of shielding plan from Connecticut ''(5/2006)'' | * Conceptual design of shielding plan from Connecticut ''(5/2006)'' | ||
* Civil design produced by engineering firm for JLab ''(10/2007)'' | * Civil design produced by engineering firm for JLab ''(10/2007)'' | ||
− | [http://www.jlab.org/~whitey/Collimator/Glue-X_Collimator-Revision-06-Aug-20-08.pdf Collimator Cave Layout Aug 20, 2008] - ''Aug 20, 2008'' | + | * [http://www.jlab.org/~whitey/Collimator/Glue-X_Collimator-Revision-06-Aug-20-08.pdf Collimator Cave Layout Aug 20, 2008] - ''Aug 20, 2008'' |
− | [http://www.jlab.org/~whitey/Collimator/Gluex_collimator_isometric.pdf Collimator Cave Isometric Jul 18, 2008] - ''July 18, 2008'' | + | * [http://www.jlab.org/~whitey/Collimator/Gluex_collimator_isometric.pdf Collimator Cave Isometric Jul 18, 2008] - ''July 18, 2008'' |
Revision as of 13:44, 1 June 2010
Contents
Tagging Spectrometer
- Conceptual drawings produced by the Glasgow group (ca. 2006)
- 35% drawings produced by the IHEP group (5/2007)
- Interface drawings produced at JLab (1/2008)
- Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008
- Tagger magnet and chamber section 2 July, 30, 2008 - July 30, 2008
- Tagger magnet Cross section from Yang Tosca Sept 10, 2008
- Tagger magnet modified Cross section from Yang Tosca Sept 26, 2008
- Tagger magnet critical interfaces Sht 2 Feb 23, 2009
- Tagger magnet critical interfaces sht 1 FEB 23, 2009
- Tagger hall Quad magnet sht 1
- Tagger hall Quad magnet sht 2
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
Active Collimator
- 100% drawings produced by Univ. of Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
- Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008
- Collimator Cave Isometric Jul 18, 2008 - July 18, 2008